26.12.2014 Views

2008 CAPER Tables - MFA - Housing New Mexico

2008 CAPER Tables - MFA - Housing New Mexico

2008 CAPER Tables - MFA - Housing New Mexico

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

IDIS - C04PR06 U.S. DEPARTMENT OF HOUSING AND URBAN DEVELOPMENT DATE: 12-31-08<br />

OFFICE OF COMMUNITY PLANNING AND DEVELOPMENT TIME: 12:10<br />

INTEGRATED DISBURSEMENT AND INFORMATION SYSTEM PAGE: 114<br />

SUMMARY OF CONSOLIDATED PLAN PROJECTS FOR REPORT YEAR <strong>2008</strong><br />

NEW MEXICO<br />

PLAN YR - AMOUNT DRAWN AMOUNT AMOUNT DRAWN<br />

PROJECT PGM PROJECT ESTIMATE COMMITTED AMOUNT THRU REPORT YEAR AVAILABLE TO DRAW IN REPORT YEAR<br />

--------- ----- ----------------- ----------------- ----------------- ----------------- -----------------<br />

HOPWA 240,577.00 240,421.78 240,421.78 0.00 0.00<br />

2003-0117 2003 SOUTHWEST CARE CENTER<br />

HOPWA 150,000.00 150,000.00 150,000.00 0.00 0.00<br />

2003-0118 2003 NM MORTGAGE FINANCE AUTHORITY<br />

HOPWA 15,750.00 15,905.22 15,905.22 0.00 0.00<br />

2003-0119 MESILLA, TOWN OF 03-C-12<br />

CDBG 274,397.00 274,397.00 274,397.00 0.00 0.00<br />

DESCRIPTION: THE TOWN OF MESILLA WILL MAKE IMPROVEMENTS TO THE MESILLA COMMUNITY CE<br />

NTER. THOASE IMPROVEMENTS WILL INCLUDE REPLACING THE ROOF AND THE HEA<br />

TING AND COOLING SYSTEM AND ASSOCIATED DUCTWORK, RENOVATING THE RESTRO<br />

OMS, PROVIDING HARDWARE FOR MANY OF THE DOORS SO THAT THEY ARE IN COMP<br />

LIANCE WITH ADA REQUIREMENTS, ADDING A FIRE SUPPRESSION STOVE HOOD SYS<br />

TEM, INCREASING THE PARKING SITUATION, AND REPLACING THE PERIMETER FEN<br />

CING.<br />

2003-0120 HATCH, VILLAGE OF 03-C-13<br />

CDBG 300,000.00 300,000.00 300,000.00 0.00 0.00<br />

DESCRIPTION: THE VILLAGE OF HATCH WILL CONTINUE WITH THE REPLACEMENT OF THE VILLAGE<br />

OWNED GAS DISTRIBUTION AND SERVICE LINES WITH THE VILLAGE OF HATCH.<br />

THIS IS PHASE III OF A CDBG PROJECT WHICH WAS FUNDED IN 2001 AND 2002.<br />

THIS PHASE WILL COMPLETE THE REPLACEMENT OF THE ENTIRE SYSTEM.<br />

2003-0121 MORIARTY, CITY OF<br />

CDBG 500,000.00 500,000.00 500,000.00 0.00 0.00<br />

DESCRIPTION: INSTALLATION OF APPROX 3000 LF OF STORM SEWER PIPE RANGING FROM 18"<br />

TO 36"DIAMETER. THE PROJECT INCLUDES INLETS AND ASPHALT PAVING ON<br />

APPROXIMATELY FIVE STREETS AND ASPALT LINED DITCHES.<br />

2003-0122 ROY, VILLAGE OF 03-C-4<br />

CDBG 180,000.00 180,000.00 180,000.00 0.00 0.00<br />

DESCRIPTION: REPLACEMENT OF 3600 LF. OF WATER LINE AND STREET UPGRADES. REPLACEMEN<br />

T OF WATER LINES AND PAVING ON TWO STREETS 4TH AND 5TH STREETS.

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!