2008 CAPER Tables - MFA - Housing New Mexico
2008 CAPER Tables - MFA - Housing New Mexico
2008 CAPER Tables - MFA - Housing New Mexico
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
IDIS - C04PR06 U.S. DEPARTMENT OF HOUSING AND URBAN DEVELOPMENT DATE: 12-31-08<br />
OFFICE OF COMMUNITY PLANNING AND DEVELOPMENT TIME: 12:10<br />
INTEGRATED DISBURSEMENT AND INFORMATION SYSTEM PAGE: 37<br />
SUMMARY OF CONSOLIDATED PLAN PROJECTS FOR REPORT YEAR <strong>2008</strong><br />
NEW MEXICO<br />
PLAN YR - AMOUNT DRAWN AMOUNT AMOUNT DRAWN<br />
PROJECT PGM PROJECT ESTIMATE COMMITTED AMOUNT THRU REPORT YEAR AVAILABLE TO DRAW IN REPORT YEAR<br />
--------- ----- ----------------- ----------------- ----------------- ----------------- -----------------<br />
CDBG 250,000.00 250,000.00 250,000.00 0.00 250,000.00<br />
DESCRIPTION: PROJECT CONSISTS OF REPAVING 2,542 LF OF CITY STREETS BY MILLING AND<br />
RECYCLING EXISTING SURFACE, ADDING 6" BASE COURSE, 3" ASPHAULT;<br />
CONCRETE CURB & GUTTER; REPAIR EXISTING SIDEWALKS AND DRIVEPADS FOR<br />
ADA COMPLIANCE. DILAPIDATED WATER AND SEWER LINES WILL BE REPLACED<br />
AS WELL, SINCE THE ACCESS WILL BE GRANTED DUE TO STREET CONSTRUCTION.<br />
2006-0009 ROY, VILLAGE OF 06-C-14 DC<br />
CDBG 455,000.00 455,000.00 409,500.00 45,500.00 409,500.00<br />
DESCRIPTION: WATER SYSTEM IMPROVEMENTS INCLUDE CONSTRUCTION OF NEW BOOSTER<br />
STATION CONSTRUCTION OF A 8" PVC WATER TRANSMISSION LINE APPROX.<br />
6 MILES REPLACING EXISTING ASBESTOS CEMENT WATER LINE TO EXISTING<br />
BOOSTER STATION AND GROUND STORAGE RESERVOIR.<br />
2006-0010 MOSQUERO, VILLAGE OF 06-C-20 DC<br />
CDBG 400,000.00 400,000.00 360,000.00 40,000.00 360,000.00<br />
DESCRIPTION: WATER DISTRIBUTION SYSTEM IMPROVEMENTS BY REPLACING SMALL DIAMETER<br />
DILAPIDATED ASBESTOS CEMENT, GALVANIZED AND CAST IRON LINES WITH APPRX<br />
6,500 LINEAR FEET OF NEW PVC LINES IN ADDITION TO REPLACEMENT OF<br />
NECESSARY APPURTENANCES.<br />
2006-0011 CLAYTON, TOWN OF 06-C-29 DC<br />
CDBG 500,000.00 500,000.00 52,125.68 447,874.32 52,125.68<br />
DESCRIPTION: WATER SYSTEM IMPROVEMENTS INCLUDE THE CONSTRUCTION OF A NEW WELL,<br />
BOOSTER PUMPING STATION, ADDING SMALLER CAPACITY PUMPS TO THE EXISTING<br />
BOOSTER STATION AND STORAGE IMPROVEMENTS.<br />
2006-0012 SAN JON, VILLAGE OF 06-C-30 DC<br />
CDBG 388,000.00 388,000.00 388,000.00 0.00 0.00<br />
DESCRIPTION: WASTE WATER SYSTEM IMPROVEMENTS INCLUDED CONSTRUCTION OF EARTHEN BERMS<br />
, REMOVAL AND DISPOSAL OF SLUDGE, AND INSTALLATION OF DISINFECTION<br />
EQUIPMENT AND OTHER MINOR ITEMS.<br />
2006-0013 SANTA ROSA, CITY OF 06-C-72 DC<br />
CDBG 250,000.00 250,000.00 225,000.00 25,000.00 225,000.00