Assessing e Values and Management of the NSW Travelling ... - Land
Assessing e Values and Management of the NSW Travelling ... - Land
Assessing e Values and Management of the NSW Travelling ... - Land
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
ASSESSING THE VALUES AND MANAGEMENT OF THE <strong>NSW</strong> TRAVELLING STOCK RESERVE<br />
Appendix D. <strong>Travelling</strong> Stock Reserve Checklist<br />
TRAVELLING STOCK RESERVE (TSR) CHECKLIST<br />
Information to accompany application<br />
_________________________RLP Board requests to remove TSR from its control.<br />
(Tick <strong>the</strong> box when task undertaken)<br />
Reserve No: ____________ Common Name __________________<br />
1. RLPB contact <strong>of</strong>ficer details Telephone: ______________________________<br />
Name:________________________<br />
Email: ___________________________________<br />
Address:_______________________ Fax: --------------------------------------------------------------<br />
_________________________________<br />
2. Preliminary discussions between RLPB <strong>and</strong> Department <strong>of</strong> L<strong>and</strong>s have been held<br />
DoL Officer__________________________________ Date _________________________(It is<br />
important that records concerning TSR’s <strong>and</strong> <strong>the</strong>ir management are correct <strong>and</strong> matching to ensure<br />
appropriateness <strong>and</strong> accuracy <strong>of</strong> proposal)<br />
3. Minister <strong>of</strong> Primary Industries consent obtained by State Council<br />
4. In relation to <strong>the</strong> subject TSR, RLPB has attached:<br />
Copy <strong>of</strong> original Government Gazettal (if available)<br />
Record <strong>of</strong> creation <strong>of</strong> <strong>the</strong> Subject TSR(s) (if available)<br />
Record <strong>of</strong> appointment <strong>of</strong> Board undertaken to manage subject TSR(s) (if available)<br />
5. Plan <strong>of</strong> <strong>the</strong> site attached – maps, aerial photos etc that clearly delineate subject TSR<br />
6. Record <strong>of</strong> inspection by RLPB including, who inspected, date <strong>and</strong> all information required below<br />
Description <strong>of</strong> TSR<br />
(Place ei<strong>the</strong>r Y or N in columns <strong>and</strong> provide comment if applicable)<br />
7. Asset Diagram <strong>of</strong> TSR<br />
(may use item 4 as base.)<br />
Show fence locations<br />
Gates<br />
Water Troughs<br />
Dams/Tanks<br />
Tracks & Trails<br />
Yards<br />
Facilities / Buildings / Structures<br />
O<strong>the</strong>r<br />
Yes No Type / Condition / Comments<br />
Current condition <strong>and</strong> use <strong>of</strong> TSR- (provide brief details - Tick box once completed)<br />
Item<br />
Details<br />
8. Weeds status (include details<br />
<strong>of</strong> type <strong>and</strong> density <strong>of</strong> weed)<br />
9. Weed control program details<br />
REPORT ON METHODOLOGY AND FINDINGS AUGUST 2009 Page 72 <strong>of</strong> 88