03.01.2015 Views

Pierscape at Navy Pier Phase II Design Team Organization + ...

Pierscape at Navy Pier Phase II Design Team Organization + ...

Pierscape at Navy Pier Phase II Design Team Organization + ...

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Cover Letter<br />

<strong>Navy</strong> <strong>Pier</strong> is a public place with a public purpose. …The Centennial Vision is about a<br />

change in approach, <strong>at</strong>titude, and aesthetic… intended to address the overall character of the<br />

pier r<strong>at</strong>her than its specific parts. _The Centennial Vision, June 2011<br />

3<br />

Dear Board of Directors of <strong>Navy</strong> <strong>Pier</strong> Inc.<br />

We are pleased to present the qualific<strong>at</strong>ions and organiz<strong>at</strong>ion of our team to the<br />

<strong>Navy</strong> <strong>Pier</strong> Board of Directors for the design of the <strong><strong>Pier</strong>scape</strong> Competition, <strong>Phase</strong> <strong>II</strong>.<br />

After a careful consider<strong>at</strong>ion we have added additional members to our team.<br />

We believed th<strong>at</strong> these new members strengthened the capabilities of our team in<br />

order to better respond to the many facets, challenges and complexities th<strong>at</strong><br />

the <strong>Navy</strong> <strong>Pier</strong> project will undergo. We believe th<strong>at</strong> Architecture, Landscape, <strong>Design</strong>,<br />

Art and Engineering can be integr<strong>at</strong>ed in a unique project. We have assembled<br />

for this project a gre<strong>at</strong> group of highly qualified professionals in order to achieve,<br />

working as a team, the goals set forth in the <strong>Navy</strong> <strong>Pier</strong> Centennial Vision.<br />

We recognize the importance<br />

of adding MBE and WBE<br />

partners to our team. Should we<br />

be selected for <strong>Phase</strong> <strong>II</strong>I, our<br />

team has a plan in place to<br />

supplement team expertise in<br />

engineering and architecture to<br />

meet <strong>Navy</strong> <strong>Pier</strong>’s MBE/WBE<br />

requirement.<br />

Following there is a list of the new team members added to our team and the<br />

role th<strong>at</strong> the will serve in our team. In a separ<strong>at</strong>e section of our <strong>Phase</strong> <strong>II</strong> submittal is<br />

included an overview and portfolio for each new team member.<br />

Tom Leader Studio will be responsible for landscape architecture and for establishing<br />

a comprehensive understanding of the pier as an integr<strong>at</strong>ed ecosystem.<br />

Lisa D. Freiman, art Cur<strong>at</strong>or and Chair of the contemporary art department <strong>at</strong> the<br />

Indianapolis Museum of Art, will be responsible for the Art cur<strong>at</strong>ion, for permanent<br />

art and temporary install<strong>at</strong>ions.<br />

Cre<strong>at</strong>ive Time will be responsible, in close collabor<strong>at</strong>ion with Lisa Freiman, for<br />

temporary art exhibitions, install<strong>at</strong>ions and event programming.<br />

Nelson Nygaard will be responsible for traffic engineering, pedestrian and bicycle<br />

planning, and accommod<strong>at</strong>ions for transit access.<br />

Fluidity will be our consultant on the design and engineering of w<strong>at</strong>er fe<strong>at</strong>ures.<br />

Faithful + Gould will be our consulting providing services to ensure feasibility of the<br />

project and cost estim<strong>at</strong>ion.<br />

On behalf of <strong>Team</strong> X, I want to thank you for your thoughtful consider<strong>at</strong>ion.<br />

Sincerely,<br />

Xavier Vendrell<br />

Principal, Xavier Vendrell Studio Chicago/Barcelona

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!