03.01.2015 Views

Pierscape at Navy Pier Phase II Design Team Organization + ...

Pierscape at Navy Pier Phase II Design Team Organization + ...

Pierscape at Navy Pier Phase II Design Team Organization + ...

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Faithful+ Gould<br />

Ford Calumet Environmental Center, Chicago Department of Environment<br />

Calumet, IL<br />

82<br />

Faithful + Gould was hired by Studio Gang Architects to provide cost estim<strong>at</strong>ing<br />

services on the Ford Calumet Environmental Center, an $11,000,000, 30,000<br />

square foot facility. Faithful + Gould provided budgets for schem<strong>at</strong>ic design, design<br />

documents and construction documents. The site, a 117 acre marsh, is loc<strong>at</strong>ed<br />

amongst fragmented p<strong>at</strong>ches of abandoned lots and emergent marshlands, shuttered<br />

and working factories, parking lots, and towns. This marsh is on the hinge of<br />

two major drainage basins and is an important stop for migr<strong>at</strong>ory birds along the<br />

Mississippi fly way. The presence of these rare birds was the impetus for the<br />

project; community members began organizing informal bird walks. The idea for the<br />

landscape was to “reset” the forest succession process and diversify the habit<strong>at</strong><br />

profile in order to support a wider range of bird and animal life.

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!