Pierscape at Navy Pier Phase II Design Team Organization + ...
Pierscape at Navy Pier Phase II Design Team Organization + ...
Pierscape at Navy Pier Phase II Design Team Organization + ...
You also want an ePaper? Increase the reach of your titles
YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.
Faithful+ Gould<br />
New Hospital Pavillion, University of Chicago Hospital<br />
Chicago, IL<br />
81<br />
Faithful + Gould cost estim<strong>at</strong>ing team played an integral role in Chicago’s most<br />
ambitious downtown park projects in the city’s history—Millennium Park.<br />
This 24.5-acre $450-million park is one of Chicago’s main focal points and a major<br />
addition to recre<strong>at</strong>ional facilities along Chicago’s lakefront fe<strong>at</strong>ruing an outdoor<br />
performing arts pavilion, an indoor year-round the<strong>at</strong>er, a restaurant, an ice-sk<strong>at</strong>ing<br />
rink, a contemporary garden, public art, fountains, landscaped walkways and<br />
green spaces. Faithful 1 Gould provided cost estim<strong>at</strong>ing and consulting services for<br />
three separ<strong>at</strong>e facilities within the park including the Metra Crossover Structure<br />
Construction, Performance Pavilion and the Ice Rink as well as the Green Space<br />
and Promenades surrounding the park.