03.01.2015 Views

Pierscape at Navy Pier Phase II Design Team Organization + ...

Pierscape at Navy Pier Phase II Design Team Organization + ...

Pierscape at Navy Pier Phase II Design Team Organization + ...

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Faithful+ Gould<br />

New Hospital Pavillion, University of Chicago Hospital<br />

Chicago, IL<br />

81<br />

Faithful + Gould cost estim<strong>at</strong>ing team played an integral role in Chicago’s most<br />

ambitious downtown park projects in the city’s history—Millennium Park.<br />

This 24.5-acre $450-million park is one of Chicago’s main focal points and a major<br />

addition to recre<strong>at</strong>ional facilities along Chicago’s lakefront fe<strong>at</strong>ruing an outdoor<br />

performing arts pavilion, an indoor year-round the<strong>at</strong>er, a restaurant, an ice-sk<strong>at</strong>ing<br />

rink, a contemporary garden, public art, fountains, landscaped walkways and<br />

green spaces. Faithful 1 Gould provided cost estim<strong>at</strong>ing and consulting services for<br />

three separ<strong>at</strong>e facilities within the park including the Metra Crossover Structure<br />

Construction, Performance Pavilion and the Ice Rink as well as the Green Space<br />

and Promenades surrounding the park.

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!