Ixia Black Book: SDN/OpenFlow
Ixia Black Book: SDN/OpenFlow
Ixia Black Book: SDN/OpenFlow
You also want an ePaper? Increase the reach of your titles
YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.
Test Case: <strong>OpenFlow</strong> Switch Setup and Functional Test<br />
Objective<br />
The <strong>OpenFlow</strong> Switch Setup and Functional test verifies the functionality of <strong>OpenFlow</strong><br />
switches. The test provides basic guidelines on how to configure <strong>OpenFlow</strong> controller,<br />
establish OF Channel, and retrieve switch capabilities using learned information. The<br />
test also trigger stat request using on demand message function and verifies that switch<br />
sends reply with requested information. At the end of the test, statistics are reviewed.<br />
Setup<br />
The following figure illustrates the test setup.<br />
Figure 2: Test Setup – <strong>OpenFlow</strong> Switch Setup and Functional Test, test setup<br />
PN 915-2635-01 Rev A December 2012 8