05.01.2015 Views

Ixia Black Book: SDN/OpenFlow

Ixia Black Book: SDN/OpenFlow

Ixia Black Book: SDN/OpenFlow

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Test Case: Switch Flow Failover Performance Test<br />

6. Prior to next control plane trigger event, perform Clear CP/DP Convergence<br />

Statistics in order to get accurate results for the next convergence event on the<br />

switch.<br />

Conclusions<br />

This test allows you to validate DUT’s ability to detect the failure and switch traffic to<br />

alternate path as fast as possible without significant packet loss. It also provides<br />

accurate traffic convergence measurements.<br />

Variables<br />

1. TrueView convergence test also provides accurate measurement for control<br />

plane to data plane convergence time. In order to perform this test, user should<br />

select control plane events check box in step#17. All other steps remain the<br />

same.<br />

Go to Statistics view and track by destination endpoint, you should notice CP/DP<br />

convergence Time column.<br />

2. Same test can be repeated for various traffic rates, number of flows and<br />

threshold values.<br />

PN 915-2635-01 Rev A December 2012 64

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!