<strong>Volume</strong> One: <strong>Written</strong> <strong>Statement</strong><br />

2<br />

Table 2.3: Indicative Capacity of Key Development Areas and<br />

rest of city for Residential Development<br />

Area<br />

Zoned Land<br />

for<br />

development<br />

(ha)<br />

Residential<br />

Zoning (ha)<br />

Estimated<br />

Capacity<br />

(housing<br />

units)<br />

Residential<br />

and Other<br />

Use Zoning<br />

(ha)<br />

Estimated<br />

Capacity<br />

(housing<br />

units)<br />

Total Housing<br />

Units<br />

City Centre 8.9 4.5 474 4.4 429 903<br />

Docklands 81.1 5.7 839 75.4 7388 8227<br />

Mahon 29 29 1650 0 0 1650<br />

Blackpool 30.3 23.3 1013 7.0 287 1300<br />

North West<br />

Regeneration Area<br />

l8.1 18.1 206 0 0 206<br />

Rest of City 75.4 67.6 3030 7.8 139 3169<br />

Total identified 242.8 148.2 7212 94.6 8243 15455<br />

zoned sites in Cork<br />

City<br />

Tivoli LAP area<br />

and zoned<br />

windfall sites in<br />

city centre and<br />

suburbs<br />

Total Cork City<br />

residential yield<br />

60 (excluding<br />

windfall sites)<br />

- - - - 5000<br />

- - - - - 20455<br />

2.18 Tables 2.3 shows that there is land available in Cork City for development of just over 20,000 residential<br />

units, sufficient to meet the target set in the SWRPGs. It is anticipated that the pace of growth in<br />

residential development will be slow to start with but will increase over the period of the Plan. The first<br />

areas likely to be developed will be sites in suburban and city centre/edge of city centre areas which<br />

are in attractive locations, are served by existing infrastructure and in some cases already have planning<br />

permission. Development in other areas where infrastructural investment is required, such as outer<br />

Docklands, will be slower to get going, but it is anticipated that it will increase in pace in the latter part<br />

of the Development Plan period. It is likely that delivery of development on all the available land will<br />

extend well beyond the Development Plan period.<br />

Employment Targets<br />

2.19 Employment in Cork City stood at 71,577 in 2011 (Cork City Employment and Land Use Survey 2011),<br />

down 2% on 2006. Some sectors such as the high tech manufacturing and service sectors grew, while<br />

others such as retail and professional services declined. However the city region has a diverse economic<br />

base with a strong FDI presence and has performed better than most parts of the country in recent<br />

years. The assumption in the Plan is that national economic recovery will result in employment growth<br />

in the city over the period of the Plan in line with that envisaged in the CASP Update. On this basis a<br />

target of 16,000 additional jobs is assumed over the period from 2011 to 2021. This is an ambitious<br />

target and is dependent on a significant economic recovery and a concentration of jobs in accessible<br />

city locations rather than on greenfield land in less sustainable locations outside the city.<br />

18 Draft Cork City Development Plan 2015-2021