TNB Financial Report 2002<br />

72 List of Properties DISTRIBUTION<br />

Nature of LAND BUILDINGS DESCRIPTION<br />

Functional<br />

Activity Leasehold Freehold Total Total Total Built-Up Total<br />

No. of Area NBV No. Area NBV<br />

DISTRIBUTION No. of Area NBV No. of Area NBV Lots (sq M) (RM’000) (sq M) (RM’000)<br />

Lots (sq M) (RM’000) Lots (sq M) (RM’000)<br />

Location (1) (2) (3) (4) (5) (6) (1+4) (2+5) (3+6) (10) (11) (12) (13)<br />

Perlis 35 16,378 501 45 71,925 1,357 80 88,303 1,858 52 1,200 3,315 Distribution<br />

Kedah 168 296,589 5,579 312 511,074 32,562 480 807,663 38,141 206 46,250 36,928 Substations<br />

Pulau Pinang 106 71,696 8,583 298 130,629 20,470 404 202,325 29,053 159 10,209 18,343<br />

Perak 530 563,012 10,195 218 530,017 4,327 748 1,093,029 14,522 246 11,680 44,558<br />

Selangor 420 203,512 41,385 495 482,718 68,749 915 686,230 110,134 669 106,127 116,241<br />

W. Persekutuan 168 121,907 41,630 123 130,868 46,584 291 252,775 88,214 215 15,485 46,941<br />

N. Sembilan 234 108,319 3,165 146 40,834 2,796 380 149,153 5,961 120 6,872 6,214<br />

Melaka 207 80,682 6,353 232 68,043 20,301 439 148,725 26,654 154 6,136 6,624<br />

Johor 637 464,188 27,877 633 391,769 35,119 1,270 855,957 62,996 450 19,774 39,661<br />

Pahang 198 157,772 6,582 181 94,830 2,480 379 252,602 9,062 143 9,957 31,836<br />

Terengganu 173 639,299 5,221 86 41,979 1,035 259 681,278 6,256 116 4,508 15,701<br />

Kelantan 165 492,502 4,625 155 233,238 5,214 320 725,740 9,839 136 67,062 10,132<br />

Sabah 51 637,841 4,442 37 173,243 1,876 88 811,084 6,318 290 84,500 32,540<br />

TOTAL 3,092 3,853,697 166,138 2,961 2,901,167 242,870 6,053 6,754,864 409,008 2,956 389,760 409,034<br />

Note:<br />

DISTRIBUTION<br />

The distribution process begins at the termination of the transmission line where distribution substations step down voltage to enable electricity to be distributed to TNB’s Customers. The distribution<br />

system consists of distribution, overhead lines and underground cables operating at voltage levels of 33kV and below.<br />

Note: NBV – Net Book Value