15.01.2015 Views

GOVERNMENT OF INDIA North Eastern Railway ... - Tenders India

GOVERNMENT OF INDIA North Eastern Railway ... - Tenders India

GOVERNMENT OF INDIA North Eastern Railway ... - Tenders India

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Dy.CSTE/Con/ IZN/02 of 2011 <strong>North</strong> <strong>Eastern</strong> <strong>Railway</strong><br />

SECTION-II ,<br />

CHAPTER – II<br />

SPECIAL CONDITIONS <strong>OF</strong> TENDER AND CONTRACT<br />

2.1 GENERAL:<br />

2.1.1 These special conditions of Tender and Contract, the technical specifications<br />

and the schedule of works of this contract in addition to the General Condition<br />

of the Contract of N. E. <strong>Railway</strong> Edition – 1999 (although meant for use in<br />

connection with Civil Engineering Works, shall also be applicable for this<br />

contract), <strong>India</strong>n <strong>Railway</strong> Code for the Engineering Department with up-todate<br />

corrections, Standard Specifications for materials and works and the<br />

<strong>India</strong>n <strong>Railway</strong> Telecommunication Manual shall govern the work to be<br />

executed.<br />

2.1.2 Where there is any conflict between these specifications and conditions (as<br />

mentioned in Para 2.1.1 above) of contract on one hand and General<br />

Conditions of Contract of <strong>North</strong> <strong>Eastern</strong> <strong>Railway</strong> on the other hand, the<br />

former shall prevail.<br />

2.1.3 Any special conditions stated by the tenderer(s) in the covering letter<br />

submitted along with the tender shall be deemed to be the part of the contract<br />

to such extant only as have explicitly been accepted by the <strong>Railway</strong>s, and<br />

incorporated in the contract agreement.<br />

2.2 DEFINATIONS AND INTERPRETATIONS<br />

2.2.1 ”Engineer” shall mean the Assistant Signal & Telecommunication Engineer<br />

(Construction) and shall include the superior officers of Signal &<br />

Telecommunication Department of the N. E. <strong>Railway</strong> i.e. Divisional Signal &<br />

Telecommunication Engineer (Construction)/Deputy Chief Signal &<br />

Telecommunication Engineers / Chief Signal & Telecommunication Engineer /<br />

Construction<br />

2.2.2 Engineer-in-charge: As specified at page No. 2. “ Engineer-in-charge” will be<br />

the in-charge for execution of this work. However railway reserves the right to<br />

change the Engineer in charge at any stage due to any reason whatsoever.<br />

2.2.3 “Site engineer” shall mean any Sr. Section Engineer/Tele of Construction<br />

Organization authorized by the Engineer-in-charge.<br />

2.3 SCOPE <strong>OF</strong> THE WORK :<br />

The scope of the work broadly includes supply of materials and execution of the work<br />

as described in details in the schedule of work, drawings and technical specifications<br />

of the tender, unless deviations if any, specifically approved by the <strong>Railway</strong>.<br />

2.4 PROGRAMME <strong>OF</strong> WORKS :-<br />

2.4.1 (a) The contractor shall have necessary resources to execute the work so that<br />

the entire work is completed within a period as mentioned in the preamble<br />

from the date of issue of Letter of Acceptance of the tender.<br />

Signature of Tenderer(s)<br />

Date…………………<br />

16

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!