GOVERNMENT OF INDIA North Eastern Railway ... - Tenders India
GOVERNMENT OF INDIA North Eastern Railway ... - Tenders India
GOVERNMENT OF INDIA North Eastern Railway ... - Tenders India
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
Dy.CSTE/Con/ IZN/02 of 2011 <strong>North</strong> <strong>Eastern</strong> <strong>Railway</strong><br />
2.5 ORDER WIRE Repeater to Repeater communication circuit shall also be<br />
provided with tone dialing or Loud speaker calling system for the maintenance<br />
of repeater station and cable huts.<br />
2.6 OTHER CONTROL CIRCUITS: With the ever increasing requirements of<br />
instantaneous communication engineering control, commercial control,<br />
carriage & wagon control etc. is also being provided in some busy section of<br />
the railways<br />
3. POINT TO POINT COMMUNICATION FOR LEVEL CROSSING GATES<br />
For informing the manned level crossing gates in the block section , regarding<br />
approaching trains , communication is provided from the nearest station master /<br />
block cabin using magneto telephones ./DTMF Telephone.<br />
4. EMERGENCY CIRCUITS:<br />
4.1 The emergency telephone circuit have been provided for enabling the train<br />
crews to contact the controller in the event of an emergency/accident. This<br />
works on 4wire system and l not have facility for calling in field station by the<br />
controller.<br />
4.2 Emergency sockets has been provided in socket boxes mounted on suitable Rail<br />
post all along route at an interval of one Km.(Max.) generally in accordance<br />
with the approved tapping diagrams. In addition to the above emergency<br />
socket have also been provided at some obligatory locations i.e. LC gates ,<br />
approach of long bridges.<br />
4.3 Communication for Disaster management: As an accident relief measure, DOT<br />
& <strong>Railway</strong> telephones are required to be extended to accident site as per<br />
<strong>Railway</strong> Board’s Letter No. 93/Safety/31/2 Dt. 1.2.93. channel provision is<br />
required to be made up to the nearest station and the circuits shall be extended<br />
to the site by drawing temporary cable when required.<br />
5. Administrative Trunk Circuits: Administrative Trunk Circuit whether departmental<br />
or DOT rented will be suitably transferred on <strong>OF</strong>C system.<br />
6. DATA CIRCUITS: PRS & FOIS circuits are data circuits which are normally located at<br />
considerable distance, hence provision for RS 232 or G.703 interface at remote<br />
location shall be required for the working of these circuits. During commissioning of<br />
<strong>OF</strong>C system, all these circuits will be transferred on <strong>OF</strong>C link.<br />
7. Other General Instructions:<br />
7.1 The <strong>Railway</strong> Control Telephone circuits, Block Circuits, Train wire circuits,<br />
Administrative Trunk Telephone circuits, Teleprinter circuits will be suitably<br />
transferred into underground <strong>OF</strong>C cables<br />
7.2 The circuit running in cable media will not be transferred into <strong>Railway</strong><br />
signaling system. Similarly no signaling circuit will be provided<br />
telecommunication cable. Telephone circuit shall not be provided in signaling<br />
cable except those that are running from cabin to cabin are from cabin to ASM<br />
office.<br />
Signature of Tenderer(s)<br />
Date…………………<br />
34