GOVERNMENT OF INDIA North Eastern Railway ... - Tenders India
GOVERNMENT OF INDIA North Eastern Railway ... - Tenders India
GOVERNMENT OF INDIA North Eastern Railway ... - Tenders India
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
Dy.CSTE/Con/ IZN/02 of 2011 <strong>North</strong> <strong>Eastern</strong> <strong>Railway</strong><br />
1. NAME <strong>OF</strong> WORK : AS CAPTIONED<br />
2. SCOPE <strong>OF</strong> WORK :<br />
SECTION – I<br />
PREAMBLE<br />
The work covered in this tender is for Shifting of existing working Telecom Equipment to<br />
new locations (Remote Hut) at Izzatnagar , Dohna , Bhojipura , Deorania , Baheri,<br />
Kichha,Pantnagar station in Bareilly – Lalkuan section of Izzatnagar division on N.E.<strong>Railway</strong><br />
due to shifting of alignment as a result of Gauge conversion, Dismantling of overhead alingment<br />
between Bareilly city –BPR ( 20 Km ) of IZN Divn. and installation of ELD in BE-LKU section.<br />
2.1 The <strong>Railway</strong> shall supply HDPE pipe<br />
2.2 The contractor shall be required to carry out all the remaining works .<br />
2.3 All the work shall be executed as per details given in technical supplement/specification.<br />
3. TENDER BID:<br />
Tender bid shall be submitted in sealed cover. The details are given in Para 1.2 of “instructions to<br />
tenders & conditions of tendering ” (section II chapter I ).<br />
4. ELIGIBILITY CRITERIA: Already specified at page No. 2 .<br />
5. LAST DATE <strong>OF</strong> SUBMISSION: Already specified at page No. 2<br />
6. DATE <strong>OF</strong> OPENING <strong>OF</strong> TENDER: Already specified at page No. 2<br />
7. COMPLETION PERIOD <strong>OF</strong> THE WORK: Already specified at page No. 2<br />
8. THE LIST <strong>OF</strong> ADDRESS TO WHICH CORRESPONDENCE AND DOCUMENTS RELATING<br />
TO THE CONTRACT SHOULD BE SENT: Already specified at page No. 2<br />
9. SUPPLY <strong>OF</strong> MATERIALS:<br />
All materials shall be supplied by the contractor at consignee’s store. Consignee has already been<br />
specified at Page N0.2. These stores will be issued to the contractor from consignee’s store. The<br />
contractor will transport the materials by their own means free of charge from consignee’s store to<br />
the site .<br />
10 SPECIFICATION/DRAWINGS:<br />
Reference of specifications / drawings of the important equipment, components and other materials<br />
required for the execution of the contract are given in technical supplement. The work shall be<br />
executed in compliance with the entire technical requirement given there.<br />
11. SCHEDULE <strong>OF</strong> QUANTITIES:<br />
The schedule of quantities for supplies and various works are indicated in schedule of work and given<br />
as enclosure to the preamble. The tenderer is advised to quote for all items.<br />
12. STORE To BE SUPPLIED BY RAILWAYS: (1) Quad Cable, (2) HDPE duct.<br />
13. INSPECTION <strong>OF</strong> MATERIALS:<br />
Materials to RDSO & TEC Specification will be inspected by RDSO as per their latest inspection<br />
Policy.<br />
The Firm should have valid type approval test for the items on the date of opening of tender.<br />
Signature of Tenderer(s)<br />
Date…………………<br />
4