Dy.CSTE/Con/ IZN/02 of 2011 <strong>North</strong> <strong>Eastern</strong> <strong>Railway</strong><br />
The date of taking over of the entire work as mentioned above, shall be treated as the<br />
date of completion of the work, for all purposes, in this contract.<br />
2.6 COMPLETION PERIOD: Time is the essence of the contract. The contractor will have to<br />
complete the work, as defined in Clause No. 2.5 above within sprecified period as<br />
mentioned at page No. 2 from the date of issue of the letter of acceptance of his<br />
tender, unless any extension to the date of completion is granted subsequently,<br />
(period being inclusive of monsoon). If extension to completion period is granted with<br />
imposition of Liquidated Damages, recovery of Liquidated Damage will be made @<br />
0.5% per week or part thereof on the total value of the contract in terms of clause on<br />
17(4) of the General Condition of Contract.<br />
The entire work shall be completed within the stipulated period except for any delays<br />
due to :<br />
a) Non supply of materials by the <strong>Railway</strong> Administration on demand of contractor.<br />
b) Decision not given by <strong>Railway</strong> administration on technical matters referred to by the<br />
contractor.<br />
c) Hindrance created by any other department.<br />
d) Disconnection not permitted by Operating Department causing delay to the work.<br />
e) Demarcation not given in time on demand.<br />
f) Power failure and power cuts.<br />
i) Due to any force de majure clause mentioned in the time limitation.<br />
Provided the delay in completion of works which is attributed by the contractor to<br />
the <strong>Railway</strong>’s causes mentioned above should be advised in writing to the <strong>Railway</strong><br />
Engineer immediately by the contractor for rectification/investigation. If such advice<br />
in writing is not given the delay will not be accepted by the <strong>Railway</strong> and no extension<br />
will be granted on this account.<br />
2.7 TIME LIMITATION: Subject to any requirement in the contract as to execution of<br />
any portion or portions of the work before completion of the whole, the contractor<br />
shall fully and finally complete the whole of the work comprised in the contract by<br />
the date entered in the contract, provided that if any modifications have been ordered<br />
which, in the opinion of the railway engineer have materially increased the<br />
magnitude of the work, then such extension of the contract date of completion may<br />
be granted as shall appear to the <strong>Railway</strong> Engineer to be reasonable in the<br />
circumstances, provided moreover that the contractor shall be responsible for<br />
requesting such extension of the date as he may consider necessary as soon as cause<br />
thereof shall arise and in any case not less than one month before expiry of the<br />
original date fixed for completion of the work.<br />
In all cases where extension of the contract date of completion is required the<br />
contractor shall have to make normal request in writing to the Engineer-in-charge of<br />
the work who shall then promptly forward such request to the competent authority<br />
with his clear and complete comments, recommendation and any other information as<br />
necessary for obtaining final decision by the competent authority.<br />
2.8 INSPECTION <strong>OF</strong> THE MATERIALS TO BE SUPPLIED BY THE CONTRACTOR:<br />
2.8.1 Material to IRS/RDSO design or specification shall be inspected by RDSO as<br />
per their latest inspection policy before they are finally used in works.<br />