Dy.CSTE/Con/ IZN/02 of 2011 <strong>North</strong> <strong>Eastern</strong> <strong>Railway</strong><br />
or his/their representative at the site shall acknowledge such instructions whatever<br />
asked upon to do and take action accordingly.<br />
2.10 REPRESENTATION ON WORKS :<br />
The contractor(s) shall nominate in writing his representative(s) on the works who<br />
will be authorized to receive and acknowledge materials issued by the <strong>Railway</strong> and<br />
take all orders issued by the inspecting official of the <strong>Railway</strong>, as mentioned in clause<br />
No. 2.9 above before commencement of execution of work at site, with intimation to<br />
the engineer-in-charge well in advance. Contractor shall also ensure that at least one<br />
nominated representative remains available at site during execution of work.<br />
2.11 SUPPLY <strong>OF</strong> MATERIALS BY RAILWAY:<br />
2.11.1 Subject to any requirement in the contract as to execution of any portion or<br />
portions of the work before completion of the whole, the contractor shall fully<br />
and finally complete the whole of the work comprised in the contract by the<br />
date entered in the contract, provided that if any modifications have been<br />
ordered which, in the opinion of the railway engineer have materially<br />
increased the magnitude of the work, then such extension of the contract date<br />
of completion may be granted as shall appear to the <strong>Railway</strong> Engineer to be<br />
reasonable in the circumstances, provided moreover that the contractor shall<br />
be responsible for requesting such extension of the date as he may consider<br />
necessary as soon as cause thereof shall arise and in any case not less than one<br />
month before expiry of the original date fixed for completion of the work.<br />
All materials shall be supplied by the contractor at consignee’s store. These store<br />
will be issued to the contractor from consignee’s store. The contractor will transport<br />
the materials by their own means free of charge to the site .<br />
2.11.2 (a)The contractor shall take delivery of materials to be supplied by the <strong>Railway</strong><br />
at Godown of consignee’s store and make his own arrangement for working<br />
out the materials to the site at his own cost. The contractor shall be responsible<br />
for checking before taking delivery that the materials given to him are all in<br />
good condition. Any replacement required for defective or broken parts have<br />
to be requisitioned and obtained by the contractor from the <strong>Railway</strong> stores<br />
depot of consignee after returning the defective or broken equipment provided<br />
the Engineer is satisfied that such breakage or defects etc. is not due to<br />
negligence etc. of the contractor or his representatives.<br />
(b) Issue of materials for execution of work :<br />
All the materials (<strong>Railway</strong> materials as well as those to be supplied by the<br />
contractor and duly accepted by the Rly.) shall be handed over to the<br />
contractor at any time for execution of the work depending upon the progress<br />
and item of the work to be executed. The contractor shall furnish a<br />
“INDEMNITY BOND” for a sum equal to the cost of materials proposed to be<br />
taken by him. The Indemnity Bond shall be made strictly as per the format<br />
given in Annexure and its validity should be at least three months beyond the<br />
date of completion period. The quantity of materials shall be given by the<br />
railway at any time shall not exceed the value of the “INDEMNITY BOND”<br />
Signature of Tenderer(s)<br />
Date…………………<br />
22