Dy.CSTE/Con/ IZN/02 of 2011 <strong>North</strong> <strong>Eastern</strong> <strong>Railway</strong><br />
All care should be taken in handling cable drums with a view to ensure safety not of<br />
the cables but also of the working party handling them. The man should not be allowed to<br />
brake the cable drum by standing in front but only from side.<br />
3.11. REWINDING AND REDRUMING <strong>OF</strong> CABLES.<br />
i) If for any reason it is found necessary to rewind a cable on a drum, cable drum<br />
with a proper barrel diameter not less than of the original drum should be<br />
chosen.<br />
ii) The drums should be mounted on cable jacks during rewinding operations<br />
using proper size of spindles passed through the flange holes which will<br />
not buckle under the lead. The cable should not be bent opposite to the set it is<br />
having already.<br />
iii) In the redruming operations the full and empty drums should be so turned that<br />
the cable passes from the bottom of the original set as little as possible\<br />
iv) Replace all the laggings on the cable drum.<br />
3.12 CABLE LAYING:<br />
3.12.1 It is advisable to employ the same people at the same place or job while cable is being<br />
laid.<br />
3.12.2 Before commencement of the laying inspection of the trench and inspection of<br />
protection works should be carried out so as to ensure their conformity with the<br />
specification. The trench bottom should be clean, smooth and free of small stone.<br />
When the soil contains stone or pieces of rock and therefore cannot be raddled, sieved<br />
earth about 10 cm thick should be used both for the bedding on which the cable is<br />
laid and for covering the cables.<br />
3.12.3 The cable drum should be brought as close to the cable trench as possible. it should be<br />
lifted with the aid of cable jacks firmly mounted on a support of stone or wood . The<br />
spindle should be minimum of 55mm diameter and lower edge of drum should be 5 to<br />
10 cm above the ground.<br />
3.12.4 Where necessary the cable drum may be placed at such a point so that 2/3 of the cable<br />
is laid directly and the balance in other direction. Care should be taken in such a case<br />
to see that there is no kinks or loops in the cable.<br />
3.12.5 The wooden battens on the drums should be carefully removed shortly prior to laying<br />
and before the drum is mounted on the jack. The nails on the lagging should be<br />
carefully removed.<br />
3.12.6 While rolling a cable drum for laying the drum shall be supported on an axle running<br />
through its center the height of the axle being such that the end frames are free to<br />
rotate and do not touch the ground at any point. The cable shall be carefully uncoiled<br />
by gently pulling the cable assisted as necessary by carefully turning the drums quick<br />
pulling of the cable or turning the drums shall be avoided at all costs. Each cable drum<br />
shall be braked while laying is in progress to prevent sharp bending or buckling,<br />
particularly when the cable coils are sticking together.<br />
3.12.7 The following personnel shall be employed near the drum.<br />
1 Man : for handling the brakes.<br />
1 Man : for permanent observation of the uncoiling of cable.<br />
Signature of Tenderer(s)<br />
Date…………………<br />
48