• Establish quality program baseline/expectations and resources.<br />

• Set minimum thresholds for technology maturity.<br />

• Establish mission success as the guiding principle.<br />

• Allow program managers to trade requirements if needed.<br />

• Train and develop staff.<br />

• Clearly define authority/accountability and responsibility<br />

(including contractors).<br />

• Develop robust systems engineering.<br />

• Align contracts for success.<br />

• Budget programs to 80 percent success.<br />

• Schedule approaches to field needed capabilities rapidly.<br />

• Utilize risk-based source selection.<br />

• Pay attention to critical systems engineering processes<br />

early in the program, before making key acquisition decisions.<br />

• Reinstitute development planning.<br />

• Establish key systems engineering/program manager personnel<br />

experience and stability.<br />

The recommended solutions generally address problems<br />

at the resource level. Unfortunately, little has changed in response<br />

to these studies and their recommendations. The collective<br />

wisdom of these panels has been lost in the bureaucracy, or<br />

“astropolitics,”—and quality recommendations have basically<br />

gone unimplemented. 6 These well-meaning efforts have not<br />

changed the environment in which program mangers operate.<br />

This is unfortunate as most of the study panelists have been<br />

recognized for leadership in their professions. They have had<br />

a unique ability to shape their own personal and business environments,<br />

creating conditions for tremendous success. The authors<br />

have heard these leaders mention, in private conversation,<br />

that they participate in an earnest and patriotic hope to improve<br />

national space and defense efforts.<br />

What should be done What should we study next Defense<br />

Secretary Robert M. Gates was on-target when he told<br />

the Senate Armed Services Committee on 27 January 2009 that<br />

repairing the defense acquisition system will take more than<br />

another study. According to Secretary Gates, “Since World War<br />

II, there have been nearly 130 studies [of procurement policy]<br />

to little avail.” 7<br />

Nearly all of the studies cite institutional and resource shortcomings,<br />

inadequate budgets, insufficient institutional systems<br />

engineering and engineering talent, weak program cost and<br />

schedule reserves, volatile program funding, instable requirements,<br />

and the like. While the studies addressed these issues<br />

solidly and with sound prescriptions, they did not focus on<br />

what program managers could do specifically to better acquire<br />

a space system. A program manager must live with the reality<br />

of resource issues, especially today when the Department<br />

of Defense (DoD), US intelligence community, and National<br />

Aeronautics and <strong>Space</strong> Administration (NASA) acquisition efforts<br />

fight for priority with competing societal needs and a severely<br />

damaged economy.<br />

Limited Success of Tried Coping Strategies<br />

Given the environment of long-standing resource limitations<br />

and ever-evolving priorities, national space institutions have<br />

explored various coping strategies, some of which achieved<br />

modest success. However, these strategies did not solve the<br />

over-arching issues partly because of their top-down resource<br />

and management focus.<br />

The early years of the National Reconnaissance Office<br />

(NRO) provide a shining example of the establishment of a<br />

lean, mean, and effective space acquisition program. The NRO<br />

recognized the need for streamlined processes and procedures<br />

that would enable it to speedily and effectively achieve its significant<br />

national mission objectives. This produced intense<br />

pressure to create tight, cohesive government management<br />

teams. The rules for organizing these small management teams<br />

were set out in Battle’s Laws, which, shown in figure 1, 8 were<br />

crafted by the Corona/Discoverer satellite system director, Col<br />

Lee Battle, as part of an early effort to achieve hard-hitting,<br />

rapid success.<br />

Battle's Laws<br />

Listed more or less in their order of importance:<br />

1. Keep the program office small and quick-reacting<br />

at all cost.<br />

2. Exercise extreme care in selecting people, then<br />

rely heavily on their personal abilities.<br />

3. Make the greatest possible use of space systems<br />

development supporting organizations. You have<br />

to make unreasonable demands to make sure of<br />

this support.<br />

4. Cut out all unnecessary paperwork.<br />

5. Control the contractor by personal contact. Each<br />

man in the program office has a particular set of<br />

contractor contacts.<br />

6. Hit all flight checkout failures hard. A fault uncorrected<br />

now will come back to haunt you.<br />

7. Rely strongly on contractor technical recommendations,<br />

once the program office has performed its<br />

function of making sure the contractor has given<br />

the problem sufficient effort.<br />

8. Don't over communicate with higher headquarters.<br />

9. Don't make a federal case out of it if your fiscal<br />

budget seems too low. These matters usually take<br />

care of themselves.<br />

10. Don't look back. History never repeats itself.<br />

Figure 1. Battle’s Laws.<br />

Battle’s Laws provided an important foundation for the<br />

NRO’s early successes. A thoughtful examination reveals that<br />

Battle’s Laws are all about organizing the government program<br />

office. Early NRO management successes in acquisition, operation,<br />

and sustainment of important satellite systems were<br />

legendary, and they were accomplished through smart, lean,<br />

well-funded, empowered program offices working together as<br />

a tight-knit team with the best contractor teams in US industry.<br />

The combined government and industry teams also had<br />

the resources, gumption, mission, and the secrecy needed to<br />

survive repeated failures until major successes were achieved.<br />

High Frontier 54