17.01.2015 Views

ea engineering: report: remedial action engineering work plan for ...

ea engineering: report: remedial action engineering work plan for ...

ea engineering: report: remedial action engineering work plan for ...

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

NASJRB WILLOW GROVE CT0 0074 2960074<br />

i<br />

Coordinate<br />

approval.<br />

<strong>action</strong> with the Contracting Officer to obtain such entry<br />

z<br />

1.13.9 '\<br />

Access to Unclassified In<strong>for</strong>mation<br />

;<br />

Access t unclassified U.S. Navy shipbuilding, conversion, or repair<br />

technolo k and related technical in<strong>for</strong>mation manuals, documents, drawings,<br />

<strong>plan</strong>s, spe ifications, and other unclassified in<strong>for</strong>mation is restricted to<br />

official ne d-to-know basis, designated by physical markings to show the<br />

appropriate ontrol designations. Handle, control, and safeguard to<br />

prevent oral, visual, and documentary disclosure to the public, to <strong>for</strong>eign<br />

sources, and / t personnel not having an official need-to-know. Return this<br />

in<strong>for</strong>mation to'the P<strong>ea</strong>rl Harbor Naval Shipyard upon completion of<br />

contracted <strong>work</strong>>%,except when specific retention authorization is granted'by<br />

the Contracting Officer.<br />

l-13.10 Photograph'<br />

s<br />

Photography is prohibited in the P<strong>ea</strong>rl Harbor Naval Shipyard. When<br />

operationally require&, submit a written request containing specific<br />

justification and details to the Video Production Center (Code 103) via<br />

review by the Security Qfficer prior to rel<strong>ea</strong>se.<br />

1.13.11 Contractor Regula ha ions<br />

‘i<br />

Comply with the following cbnditions:<br />

a.<br />

b.<br />

C.<br />

d.<br />

e.<br />

f.<br />

(3.<br />

h.<br />

Submit a Visit Request (VR) and Special Access Determination (SAD)<br />

<strong>for</strong> <strong>ea</strong>ch person li.sted,*to the Security Officer (Code 1125.2) via<br />

the Contracting Officeriat l<strong>ea</strong>st 6 weeks prior to the start date.<br />

Employees and representat$ves requiring access are U.S. citizens<br />

or U.S. nationals.<br />

Under no circumstances<br />

',<br />

shall,{personnel handcarry their own visit<br />

request. ', <br />

Employees shall provide documented proof of U.S. citizenship to<br />

the Pass and ID Office prior toLbeing issued a Shipyard badge.<br />

Employees shall be available <strong>for</strong> ‘Interviews upon request by the<br />

Shipyard Personnel Security Specia'Aist.<br />

Employees' representatives shall attend a 15-minute orientation on<br />

the safety, security, and radiological protection aspects of<br />

industrial operations within the Shipyard. The briefing, in the<br />

<strong>for</strong>m of a video tape presentation, will!be given at the Pass and<br />

ID Office in groups of 10, prior to the \issuance of Shipyard<br />

badges or passes. Special arrangements <strong>for</strong> larger groups can be<br />

arranged on request.<br />

\<br />

Employees shall w<strong>ea</strong>r and display the Shipyard badge in the chest<br />

ar<strong>ea</strong> at all times while entering, remaining in, and exiting<br />

Shipyard spaces and <strong>ea</strong>ch badge shall be used only by the specific<br />

individual named on the badge.<br />

Vehicles in Shipyard ar<strong>ea</strong>s shall display a valid Naval Base<br />

vehicle pass and shall have company's name on both sides of any<br />

vehicle that enters the CIA.<br />

SECTION 01140 Page 23

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!