NASJRB WILLOW GROVE CT0 0074 2960074<br />

below existing surface.<br />

3.1.3 Unsuitable Material<br />

Remove vegetation, debris, decayed vegetable matter, sod, mulch, and<br />

rubbish undern<strong>ea</strong>th paved ar<strong>ea</strong>s or concrete slabs.<br />

Proof‘felling shall be done on an exposed subgrade free of surface water<br />

(wet conditions resulting from rainfall) which would promote degradation of<br />

an otherwise a&eptable subgrade. [After stripping,] proof roll the<br />

existing subgrade o%%he~ [building] [ ] with six passes of a 15 ton,<br />

pneumatic-tired roller. ‘Opgrate the roller in a systematic manner to<br />

ensure the number of passes over all ar<strong>ea</strong>s, and at speeds between 2 l/2 to<br />

3 l/2 miles per hour. [When proof rolling under buildings, the building<br />

subgrade shall be considered to extend"'5feet beyond the building lines,<br />

and one-half of the passes made with the roller shall be in a direction<br />

perpendicular to the other passes.] Notify the"Cont,racting Officer a<br />

minimum of 3 days prior to proof rolling. Proof rolling shall be per<strong>for</strong>med<br />

in the presence of the Contracting Officer. Rutting or pump.ing of material<br />

shall be undercut [as directed by the Contracting Officer] [to-a depth of<br />

[ ] inches] and replaced with [fill and backfill] [select] material.<br />

[Bids shall be based on replacing approximately [ I square yards, tiFt.h<br />

an average depth of I I inches at various locations.]<br />

3.2 PROTECTION<br />

3.2.1 Protection Systems<br />

Provide shoring, bracing, [ ' 1 rlln~ * .<br />

I and sheeting in<br />

accordance with COE EM-385-l-l , except that banks may be sloped only when<br />

approved by the Contracting Officer . [Provide additional supporting<br />

systems where indicated.] 7<br />

3.2.2 Drainage and Dewatering<br />

Provide <strong>for</strong> the collection and disposal of surface and subsurface water<br />

encountered during construction.<br />

3.2.2.1 Drainage<br />

So that construction operations progress successfully, completely drain<br />

construction site during periods of construction to keep soil materials<br />

sufficiently dry. Provide temporary ditches, swales, and other drainage<br />

f<strong>ea</strong>tures and equipment as required to maintain dry soils. When unsuitable<br />

<strong>work</strong>ing plat<strong>for</strong>ms <strong>for</strong> equipment operation and unsuitable soil support <strong>for</strong><br />

subsequent construction f<strong>ea</strong>tures develop, remove unsuitable material and<br />

provide new soil material as specified herein.<br />

SECTION 02315 Page 7