17.01.2015 Views

ea engineering: report: remedial action engineering work plan for ...

ea engineering: report: remedial action engineering work plan for ...

ea engineering: report: remedial action engineering work plan for ...

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Project: 296.0074<br />

Revision: PRAFT<br />

Page 6- 1<br />

EA Engineering, Science, and Techology April 29, 1997<br />

6. WASTE MANAGEIVEN’I’<br />

6.1 WASTE DISPOSITION<br />

Waste materials to be generated as a result of <strong>remedial</strong> <strong>action</strong> activities include POL, granular<br />

activated carbon, asphalt, and soil. Handling, transportation and disposal of waste materials<br />

will be conducted in accordance with applicable federal and state laws, as well NASJRB<br />

policies and procedures. Materials transported off site will be manifested on the appropriate<br />

Bill of Lading to document the type of material, quantity, and final destination and disposition<br />

of the waste.<br />

POL product will be collected in a storage tank. When sufficient quantity of product has<br />

accumulated in the tank, it will be transferred to a tanker <strong>for</strong> offsite disposal.<br />

Granular activated cat-bon (GAG) units are used in the tr<strong>ea</strong>tment of the recovered ground<br />

water. GAC will be removed from the units and transported off-site <strong>for</strong> regeneration.<br />

Waste asphalt will be generated as a result of trenching and excavation activities. A staging<br />

ar<strong>ea</strong> consisting of a roll-off container will be established on site. Waste asphalt will be stockpiled<br />

in the roll-off container prior to off-site transportation and disposal.<br />

Soil will be generated from trenching and well retrofitting activities. Excavated soil will be<br />

disposed on-site by spr<strong>ea</strong>ding the soil in designated ar<strong>ea</strong>s. As soil is excavated, it will be<br />

staged adjacent to the location from which is was excavated. Soil which can be used as<br />

backfill will be placed back into the trench. Excess soil or soil not meeting specifications <strong>for</strong><br />

backfill will be spr<strong>ea</strong>d in the designated on site ar<strong>ea</strong>s.<br />

6.2 TRANSPORTATION AND DISPOSAL SUBCONTRACTORS<br />

The following provides in<strong>for</strong>mation on the subcontractors to be utilized <strong>for</strong> the off-site<br />

transportation and disposal of waste materials. Each of the subcontractors listed below has<br />

been providing services to NASJRB.<br />

POL Product:<br />

ABC Tank Company<br />

Contact Name: Boyd Campbell<br />

1025 North Contact Phone: (609) 88 l-3843<br />

Clayton, New Jersey 08312<br />

NASJRB Willow Grove; Navy Fuel Farm<br />

Remedial Action Engineering Work Plan

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!