EA Engineering, Science, and Technology<br />
_^_..-.-- ““”<br />
Project: 296.0074<br />
Revision: DRAFT<br />
Page 5-l<br />
April 29, 1997<br />
-~__-<br />
5.1. EROSION CONTROLS<br />
5. ENVIRONMENTAL PROTECTION<br />
The construction activities will be per<strong>for</strong>med in a manner to have minimal impacts on the<br />
surrounding environment. It is anticipated that excavations will be backfilled at the end of <strong>ea</strong>ch<br />
<strong>work</strong>ing day to minimize erosion. Soil that is not used as backfill will be staged and covered with<br />
plastic until the excavations are completely backfilled. Upon conclusion of the construction<br />
activities remaining soil will be spr<strong>ea</strong>d in a designated ar<strong>ea</strong> and seeded and covered with straw.<br />
5.2 DISCHARGE PERMITS<br />
An air discharge permit was obtained <strong>for</strong> the pilot study that was conducted at the Navy Fuel<br />
Farm. A copy of the existing discharge permit is presented in Attachment E. The existing air<br />
permit will be modified <strong>for</strong> the addition of two additional vapor recovery wells to the existing<br />
system.<br />
Tr<strong>ea</strong>ted ground water currently discharged to the NASJRB Willow Grove sanitary sewer system<br />
and a discharge permit is not required. Tr<strong>ea</strong>ted ground water from the new <strong>remedial</strong> system will<br />
be discharged to the sanitary sewer by way of a new below-ground discharge line that will be<br />
installed during the construction activities. The additional discharge flow rate that will be<br />
obtained as part of this new system configuration will not require an additional discharge permit.<br />
The Public Works Department has been notified of the incr<strong>ea</strong>se in discharge flow rate and have<br />
approved the modification.<br />
5.3 BUILDING AND CONSTRUCTION PERMITS<br />
Building and/or construction permits are not required <strong>for</strong> this expansion to an existing pilot<br />
<strong>remedial</strong> system. The construction of a concrete pad, the erection of a temporary building, and<br />
electrical connections to an existing electrical service will require coordination with NASJRB<br />
Willow Grove Public Works and/or the office of the Resident Officer in Charge of Construction.<br />
System schematics, site <strong>plan</strong>s, and equipment specifications will be provided to the appropriate<br />
NASJRB Willow Grove personnel to facilitate the field construction activities. In the event of<br />
conflicting schedules with other onsite construction projects, EA will take direction from<br />
Northern Division and the Resident Officer in Charge of Construction office.<br />