NASJRB WILLOW GROVE CT0 0074 2960074<br />

overexcavations and changes in grade due to pile driving operations to 95<br />

percent of ASTM D 698 maximum density.<br />

3.3.3 Pipe Trenches<br />

Excavate to the dimension indicated. Grade bottom of trenches to provide<br />

uni<strong>for</strong>m support <strong>for</strong> <strong>ea</strong>ch section of pipe after pipe bedding placement.<br />

will l<strong>ea</strong>ve in an unshattered and solid condition.<br />

Roughen level surfaces surfaces into benches <strong>for</strong> bond with<br />

concrete. Protect shale from<br />

or cl<strong>ea</strong>vage <strong>plan</strong>es and other t<br />

[and rock] beyond lines and gr<br />

payment.1<br />

3.4 FILLING AND BACKFILLING<br />

Fill and backfill to contours, elevations, and dimensions indicated.<br />

Compact <strong>ea</strong>ch lift be<strong>for</strong>e placing overlaying lift.<br />

11 of] pile-supported<br />

Place in [61 [ ] inch lifts. Compact ar<strong>ea</strong>s not accessible<br />

th mechanical hand tampers. Aerate material<br />

in to a satisfactory moisture content. Finish<br />

to a smooth sur+ce by blading, rolling with a smooth roller/or both.<br />

“.<br />

3.4.2 Backfill and“Fi,ll Material Placement<br />

..<br />

Provide <strong>for</strong> paved ar<strong>ea</strong>s and under concrete slabs, except where select<br />

material is provided. Pla&e.in [6] [ I inchlifts. Place backfill<br />

material adjacent to structure&as the structural elements are completed<br />

and accepted. Backfill against concrete only when approved. Place and<br />

compact material to avoid loading upon or against the structure.<br />

\<br />

3.4.3 Select Material Placement<br />

Provide under [porous fill of] structures not 'le supported. Place in<br />

[61 I- ] inch lifts. Backfill adjacent to st tures shall be placed as<br />

structural elements are completed and accepted. \<br />

Ba fill against concrete<br />

only when approved. Place and compact material to a& loading upon or<br />

against structure.<br />

3.4.4 Porous Fill Placement<br />

Provide under floor slab on a compacted subgrade. Place in [4] [<br />

..ms<br />

3.4.5 Trench Backfilling<br />

Backfill as rapidly as construction, testing, and acceptance of <strong>work</strong><br />

SECTION 02315 Page 9