17.01.2015 Views

ea engineering: report: remedial action engineering work plan for ...

ea engineering: report: remedial action engineering work plan for ...

ea engineering: report: remedial action engineering work plan for ...

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

NASJRB WILLOW GROVE CT0 0074 2960074<br />

SECTION 01140<br />

1 WORK RESTRICTIONS<br />

09/96<br />

8<br />

PART 1<br />

GENERAL<br />

1.1.1 SD-18, Records<br />

1<br />

I<br />

8<br />

8<br />

E<br />

a.<br />

b.<br />

c.<br />

a.<br />

e.<br />

f.<br />

cr.<br />

h.<br />

Visit Request <strong>for</strong> P<strong>ea</strong>rl harbor Naval Shipyard Form (PHNSY<br />

14ND-SYD-5512,'28) G<br />

Completed Special Access Determination (NAVSEA 5510/15) G<br />

Pier parking authorization G<br />

Government guard services G<br />

MSRB G<br />

Dining and lodging requirements G<br />

Housing <strong>plan</strong> G<br />

Medical <strong>plan</strong> G<br />

8<br />

E<br />

8<br />

I”i\<br />

1.<br />

j.<br />

k.<br />

Contractor regulations G<br />

Transportation of personnel, materials, and equipment G<br />

Purchase orders Gl<br />

[SPECIAL SCHEDULING REQUIREMENTS<br />

1 shall be r<strong>ea</strong>dy <strong>for</strong> operation as approved by Contracting<br />

a~;e;;;t:y started on [ I which would interfere<br />

b. and personnel required to per<strong>for</strong>m the<br />

Specific<br />

(1) r -1<br />

(2) [ -1<br />

II<br />

C.<br />

construction<br />

operations<br />

period.<br />

of the activity.1<br />

---. \<br />

1.3 CONTRACTOR ACCESS AND USE OF PREMISES I '.<br />

8<br />

c<br />

SECTION 01140 Page 1

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!