17.01.2015 Views

ea engineering: report: remedial action engineering work plan for ...

ea engineering: report: remedial action engineering work plan for ...

ea engineering: report: remedial action engineering work plan for ...

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

NASJRB WILLOW GROVE CT0 0074 2960074<br />

Compact ar<strong>ea</strong>s within 5 feet of strmn t-n IsO] I ..-I pencil& nf @ST&L-<br />

D 6981 [ASTM D 15571.<br />

3.7.5 Paved Ar<strong>ea</strong>s<br />

Compact top 12 inches of subgrades to<br />

ASTM D 15571. Compact fill and backfill<br />

[95] [<br />

materials<br />

] percent of [ASTM D 6981 [<br />

to 95 percent of [ASTM D<br />

6981 [ASTM D 15573.<br />

-<br />

. .<br />

Compact top 24 inches oj ed pavement or top 12 inches of<br />

subgrades, whichever is gr<strong>ea</strong>ter, to [1-l uercent of ASTM D 1557;<br />

compact fill and backfill material to [1QO] [-1 per D 1557.<br />

3.8 FINISH OPERATIONS<br />

3.8.1 Grading<br />

Finish grades as indicated within one-tenth of one foot. Grade ar<strong>ea</strong>s to<br />

drain water away from structures. For existing grades that will remain but<br />

which were disturbed by Contractor's operations, grade as directed.<br />

-3...8* 2 Seed<br />

[P&.&de as specified in Section 02921, "Turf."]<br />

[Scarify eGi.sting subgrade. Provide 4 inches of topsoil <strong>for</strong> newly graded<br />

finish <strong>ea</strong>rth surfaces and ar<strong>ea</strong>s disturbed by the Contractor. [Additional<br />

topsoil will not be.required ii <strong>work</strong> is per<strong>for</strong>med in compliance with<br />

stripping and stockpiling requirements.] [If there is insufficient on-site<br />

topsoil meeting specified requirements <strong>for</strong> topsoil, provide topsoil<br />

required in excess of that avai-lable.] Seed shall match existing<br />

vegetation. Provide seed at 5 pounds per 1000 square feet. Provide CID<br />

A-A-1909, Type I, Class 2, 10-10-10 analysis fertilizer at 25 pounds per<br />

1000 square feet. [Provide commercial agricultural limestone of 94-80-14<br />

analysis at 70 pounds per 1000 square feet.jvrovide mulch and water to<br />

establish an acceptable stand of grass.] \<br />

3.8.3 Protection of Surfaces<br />

\ +..<br />

Protect newly graded ar<strong>ea</strong>s from traffic, erosion, and settle&&s that may<br />

occur. Repair or reestablish damaged grades, elevations, or slop>.<br />

3.9 DISPOSITION OF SURPLUS MATERIAL' 1,<br />

[Waste in Government<br />

hall1 Ji-+lnrc<br />

or other &<br />

nf !<br />

material not<br />

and brush, refuse,<br />

SECTION 02315 Page 11

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!