Brian R. Stempowski<br />

Project Engineer<br />

Education: MS.; Johns Hopkins University; Enviromnental Engineering and Science; 1995<br />

B.S.; Pennsylvania State University; Environmental Resource Management: 1991<br />

Training:<br />

OSHA 4O-Hour Hazardous Waste Site H<strong>ea</strong>lth and Safety Course<br />

Theory and Practice of Ground Water Monitoring and Sampling (NGWA, 1992)<br />

Monitoring and Recovery Well Design and Installation (Handex of Maryland, 1991)<br />

Mr. Stempowski has over five y<strong>ea</strong>rs experience as a Project Engineer involved in designing, permitting,<br />

constructing, and operating ground water and soil remediation systems. He also has experience installing<br />

monitoring and recovery wells, conducting aquifer and f<strong>ea</strong>sibility tests, and per<strong>for</strong>ming <strong>remedial</strong> focused<br />

site assessments and c.haracterizations.<br />

Remedi& hestigafim mtd Rentediaf Actian- As project engineer and hydrogeologist conducted<br />

investigations and assessments at more than 45 above ground storage tank (AST) and underground storage<br />

tank (UST) sites in DC, MD, PA, and VA <strong>for</strong> governmnt and private sector clients. Designed and installed<br />

over 15 ground water and soil remediation systems and conducted operation and maintenance activities on<br />

approximately 35 different systems. Systems include ground water pump and tr<strong>ea</strong>t, free product recovery, air<br />

sparging, and soil vapor extr<strong>action</strong> systems utilizing granular activated carbon adsorption, air stripping, and<br />

thermal and catalytic oxidation tr<strong>ea</strong>tment technologies. Also per<strong>for</strong>med system operation and maintenance<br />

activities and prepared client and regulatory <strong>report</strong>s. Provided on-site consuftation, instruction, and<br />

documentation; collected soil. sludge, and liquid samples, and prepared detailed tank closure <strong>report</strong>s <strong>for</strong><br />

underground storage tank removals at over 25 sites. Advised client on required <strong>action</strong>s and related options<br />

regarding potential <strong>remedial</strong> <strong>action</strong> and negotiated with State inspectors. Also coordinated tank and soil<br />

disposal and prepared all associated cost estimates and proposals.<br />

C<strong>ea</strong>teehrkxl Experienee- Designed, installed, and developed over 50 monitoring, recovery, soil vapor<br />

extr<strong>action</strong>, and air sparging wells utilizing hollow stem auger and air rotary drilling techniques. Prepared<br />

geologic boring logs and cross sections, and conducted aquifer slug and pump tests. Also installed and<br />

classified many soil borings and collected discrete soil and aquifer material samples <strong>for</strong> geotechnical and<br />

hydrogeoIogicd1 analyses. Construction experience includes grading, sub-base comp<strong>action</strong> testing, and<br />

roadway binding and w<strong>ea</strong>ring course installation and inspection.<br />

EmergertcJt Response- Member of several initial and follow-up emergency spill/l<strong>ea</strong>k response t<strong>ea</strong>ms<br />

generally associated with the rel<strong>ea</strong>se of petroleum products. Instituted emergency spill containment and<br />

hazard ahatement procedures, coordinated response <strong>action</strong>s, developed and employed emergency control<br />

ethods including the installation of interceptor trenches, recovery sumps and wells, and vapor extr<strong>action</strong><br />

systems. Coordinated activities with local Fire and H<strong>ea</strong>lth Departments and state and Iocal environmental<br />

agencies.<br />

Cost ~Stinla~~lg~Prapasal~Bid Lkvelopm.e~zt- Developed annual operation and maintenance budgets <strong>for</strong><br />

ground water monitoring and remediatictn sites and asisted in the preparation of bid documents and<br />

specifications <strong>for</strong> both Federal and private contracts. Prepared monitoring, sampling, and remediation system<br />

construction, operation, and maintenance cost estimates. Also prepared site assessment, characterization,<br />

<strong>remedial</strong> investigation, and tkasihility study prclposals.<br />

Project Managme~~t- Effectively managed several ground water and soil remediation system construction<br />

projects including subcontractor contracting and coordination. Also managed annual operation and<br />

maintenance activities at up to 20 petroleum remediation sites. Experienced in cost estimating, proposal<br />

preparation, budget tracking, and invoicing.