20.01.2015 Views

Hydrometers Operation and Maintenance Manual - Baseline Systems

Hydrometers Operation and Maintenance Manual - Baseline Systems

Hydrometers Operation and Maintenance Manual - Baseline Systems

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Drainage Valve<br />

DRAINAGE VALVE<br />

At the beginning of the winter it is necessary to drain the water from the pipeline in order to<br />

prevent the pipes from bursting. (Please refer to the drawing below)<br />

• Before draining, it is very important to ensure that there is no pressure in the line.<br />

• Dissassemble plug (1)<br />

• Assemble the drainage ball valve (2)<br />

• Assemble elbow (3)<br />

CAUTION: Do not use compressed air to blow out hydrometer.<br />

<strong>Hydrometers</strong> <strong>Operation</strong> <strong>and</strong> <strong>Maintenance</strong> <strong>Manual</strong> • 15

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!