Hydrometers Operation and Maintenance Manual - Baseline Systems
Hydrometers Operation and Maintenance Manual - Baseline Systems
Hydrometers Operation and Maintenance Manual - Baseline Systems
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
Drainage Valve<br />
DRAINAGE VALVE<br />
At the beginning of the winter it is necessary to drain the water from the pipeline in order to<br />
prevent the pipes from bursting. (Please refer to the drawing below)<br />
• Before draining, it is very important to ensure that there is no pressure in the line.<br />
• Dissassemble plug (1)<br />
• Assemble the drainage ball valve (2)<br />
• Assemble elbow (3)<br />
CAUTION: Do not use compressed air to blow out hydrometer.<br />
<strong>Hydrometers</strong> <strong>Operation</strong> <strong>and</strong> <strong>Maintenance</strong> <strong>Manual</strong> • 15