Manual 31 Guidelines for calibrating a binder distributor ... - Aapaq.org
Manual 31 Guidelines for calibrating a binder distributor ... - Aapaq.org
Manual 31 Guidelines for calibrating a binder distributor ... - Aapaq.org
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
APPENDIX A<br />
Binder Distributor inspection check lists<br />
A.1 General visual requirements <strong>for</strong> bitumen <strong>distributor</strong>s Yes No<br />
Is there a plate on the vehicle on<br />
which the following in<strong>for</strong>mation is<br />
shown:<br />
• The name of the manufacturer<br />
• The nominal capacity of the tank<br />
• The tank serial number/<br />
<strong>distributor</strong> identification number<br />
appearing on the tank<br />
Is the contents capacity of the<br />
tank 5% more than the nominal<br />
capacity<br />
Is the tank covered by insulated material<br />
Manufacturer:<br />
..................................................<br />
Nominal capacity:<br />
............................................ (L)<br />
Tank serial-/<strong>distributor</strong> identification<br />
number:<br />
............................................ (L)<br />
Tank capacity:<br />
Does the tank have a positive circulation system<br />
............................................ (L)<br />
Does the <strong>distributor</strong> identification number appear on all the following:<br />
The <strong>distributor</strong> vehicle<br />
The tank<br />
The dipstick<br />
The spray bar<br />
The pump<br />
The thermometers<br />
The pressure gauges<br />
The speed tachometers<br />
Is there any apparent damage to the tank itself<br />
Are all the elements of the logbook present, do they appear to be valid<br />
and do the logbook serial numbers match those on the parts of the<br />
<strong>distributor</strong><br />
(General requirements approved only if all the white blocks are ticked)<br />
These requirements have to be met be<strong>for</strong>e further checks and tests are made.<br />
The rest of this check list can be completed as the inspection progresses.<br />
36