ISAT SITE/CAMPUS PROBLEMS ENCOUNTERED<br />
Hospitality L4 Waterval Boven ISAT was partially completed - only task 1 <strong>and</strong> part<br />
of task 2 had been done; task could not be<br />
completed because of difficulties in accessing the<br />
internet. The practical task had not yet been<br />
completed by the day of the visit.<br />
Hospitality L2 Witbank ISAT incomplete - only tasks 1-3 had been<br />
completed; practical task was still to be<br />
completed.<br />
Hospitality L4 Witbank ISAT had been partially completed, practical task<br />
was still outst<strong>and</strong>ing.<br />
Management L4 King Lecturer misinterpreted the tasks – used college<br />
data contrary to the stipulations of the ISAT. Also,<br />
there was little evidence to confirm authenticity of<br />
student presentations.<br />
Management L2, 4 Bloemfontein Not all students had completed all sections, owing<br />
to absenteeism.<br />
Mechatronics L2, 3 Pretoria West Tasks which had not been completed by the time<br />
of the verification visit could be completed in time,<br />
if the ISAT conduct schedule was strictly adhered<br />
to.<br />
Mechatronics L3 Vereeniging All tasks were completed except for that of Electro-<br />
Technology. There was a delay in completing the<br />
task due to a shortage of workstations <strong>and</strong><br />
resources (the motor had been ordered in<br />
November 2011 but had still not been delivered).<br />
However, ISAT conduct was underway despite the<br />
challenges <strong>and</strong> could still be concluded in time.<br />
Mechatronics L3 Westlake Sub task 2.2 had been modified since the college<br />
did not have all the components with which to<br />
complete it. In this case a pressure control valve<br />
was used instead of flow control. Students had to<br />
do mechanical drawings by h<strong>and</strong> as the college<br />
did not have the software to do them on<br />
computer.<br />
Office Administration L4 Bloemfontein Tasks had not been completed by the date of the<br />
moderation visit. According to the plan this was<br />
scheduled for a future date.<br />
Office Administration L2 Ermelo Task 3 was done in the reception area because<br />
there was no simulation room. There was no proof<br />
of faxing which was a requirement for the ISAT.<br />
Office Administration L4 Ermelo Some tasks were not completed to the<br />
specifications of the ISAT. Task 3 was particularly<br />
poorly done.<br />
Office Administration L2 Moremogolo Parts of tasks had not been completed but marks<br />
had been awarded (parts 3.1; 3.3 <strong>and</strong> 3.4 of task 3<br />
were not done but marks were given to all<br />
96