22.01.2015 Views

(Vocational) and - Umalusi

(Vocational) and - Umalusi

(Vocational) and - Umalusi

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

ISAT SITE/CAMPUS PROBLEMS ENCOUNTERED<br />

Hospitality L4 Waterval Boven ISAT was partially completed - only task 1 <strong>and</strong> part<br />

of task 2 had been done; task could not be<br />

completed because of difficulties in accessing the<br />

internet. The practical task had not yet been<br />

completed by the day of the visit.<br />

Hospitality L2 Witbank ISAT incomplete - only tasks 1-3 had been<br />

completed; practical task was still to be<br />

completed.<br />

Hospitality L4 Witbank ISAT had been partially completed, practical task<br />

was still outst<strong>and</strong>ing.<br />

Management L4 King Lecturer misinterpreted the tasks – used college<br />

data contrary to the stipulations of the ISAT. Also,<br />

there was little evidence to confirm authenticity of<br />

student presentations.<br />

Management L2, 4 Bloemfontein Not all students had completed all sections, owing<br />

to absenteeism.<br />

Mechatronics L2, 3 Pretoria West Tasks which had not been completed by the time<br />

of the verification visit could be completed in time,<br />

if the ISAT conduct schedule was strictly adhered<br />

to.<br />

Mechatronics L3 Vereeniging All tasks were completed except for that of Electro-<br />

Technology. There was a delay in completing the<br />

task due to a shortage of workstations <strong>and</strong><br />

resources (the motor had been ordered in<br />

November 2011 but had still not been delivered).<br />

However, ISAT conduct was underway despite the<br />

challenges <strong>and</strong> could still be concluded in time.<br />

Mechatronics L3 Westlake Sub task 2.2 had been modified since the college<br />

did not have all the components with which to<br />

complete it. In this case a pressure control valve<br />

was used instead of flow control. Students had to<br />

do mechanical drawings by h<strong>and</strong> as the college<br />

did not have the software to do them on<br />

computer.<br />

Office Administration L4 Bloemfontein Tasks had not been completed by the date of the<br />

moderation visit. According to the plan this was<br />

scheduled for a future date.<br />

Office Administration L2 Ermelo Task 3 was done in the reception area because<br />

there was no simulation room. There was no proof<br />

of faxing which was a requirement for the ISAT.<br />

Office Administration L4 Ermelo Some tasks were not completed to the<br />

specifications of the ISAT. Task 3 was particularly<br />

poorly done.<br />

Office Administration L2 Moremogolo Parts of tasks had not been completed but marks<br />

had been awarded (parts 3.1; 3.3 <strong>and</strong> 3.4 of task 3<br />

were not done but marks were given to all<br />

96

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!