8.10. Securing for uplift<br />

Products must be fixed as soon as they are placed on the roof or façade to<br />

avoid any uplift due to the action of the wind.<br />

Before interrupting the work, it is necessary to check that all the products are<br />

properly fixed and the bundles are also fixed with some straps to avoid risks of<br />

falling materials.<br />

Direction of installation is important for an easier secure.<br />

8.11. Holes<br />

Pipe penetrations must be properly made in concordance with the design taking<br />

in consideration that:<br />

• Pipes can not transmit forces to the façade<br />

• Reduction of the thermal bridges is a must<br />

• Flashings must be water and air tight<br />

8.12. Design of flashings<br />

Flashings must be defined following some recommendations:<br />

• Flat surface shouldn’t be larger than 250 mm to keep the flatness<br />

• Small slope is recommended to avoid water retention.<br />

• Drip is recommended in any flashing to reduce the dirty on the façade.<br />