Only if cutting list,<br />

drawings have been<br />

made by AMC<br />

Only if installation is<br />

supervised by AMC<br />

Check list<br />

Site<br />

Tidy and clean<br />

Y N<br />

Delivery On time<br />

Y N<br />

Number of times<br />

Packages properly storages<br />

Y N<br />

Material properly lifted from packet to site<br />

Y N<br />

On time<br />

Y N<br />

Delays<br />

Y N<br />

Roof<br />

Fixation to the roof Y N<br />

Are properly Junctions<br />

Y N<br />

done Ends<br />

Y N<br />

Gutters<br />

Expansion joints<br />

Y N<br />

Are they Shavings<br />

Y N<br />

clean bubles<br />

Y N<br />

Are installed Joints<br />

Y N<br />

properly mouths<br />

Y N<br />

Aligment of the gutter and ridge<br />

Y N<br />

Undulations, scratchs, dents, material properly managed<br />

Y N<br />

Roof is lengh enough at the gutter<br />

Y N<br />

Overlaps of the roof are properly done<br />

Y N<br />

Fixations are enough and well positioned<br />

Y N<br />

Roof material properly fixed<br />

Y N<br />

Ridge properly installed<br />

Y N<br />

Ridge joints properly installed<br />

Y N<br />

End of the roof material is properly folded<br />

Y N<br />

Fixation of flashings properly done<br />

Y N<br />

Every solution is water proof<br />

Y N<br />

Holes revised and properly done<br />

Y N<br />

Protected film properly retired and storaged<br />

Y N<br />

Roof cleaned<br />

Y N<br />

Façade<br />

Material properly lifted from packet to site<br />

Y N<br />

Material without bubles and undulations<br />

Y N<br />

Fixations are enough and well positioned<br />

Y N<br />

Drip and façade are properly leveled and aligned<br />

Y N<br />

Doors, Windows and holes properly done and flashings installed<br />

Y N<br />

Overlaps or vertical joints properly installed and sealed<br />

Y N<br />

Drip is properly aligned<br />

Y N<br />

Corners are properly aligned<br />

Y N<br />

Windows are properly aligned<br />

Y N<br />

Flashings properly designed<br />

Y N<br />

Flashings properly sealed and fixed<br />

Y N<br />

Drip flashing doesn't have any dent<br />

Y N<br />

Safety<br />

Installers have finished the safety training<br />

Y N<br />

Safety speach has been done to the installers<br />

Y N<br />

Collective safety measures are installed<br />

Access to the roof is safe<br />

Y N<br />

Electricity wires are at the right distance and properly insulated<br />

Y N<br />

Electrical box containers have a "gadget that cut the electricity if contact with metal" Y N<br />

Installers have the right tools for the installation<br />

Y N<br />

Material packets are properly placed and/or fixed<br />

Y N<br />

Scaffolding and platforms are safe<br />

Y N<br />

The ground permits the movement of the platforms<br />

Y N<br />

The roof holes are protected aganist fallings<br />

Y N<br />

Working area is properly indicated<br />

Y N<br />

Installers have the individual safety elements<br />

Y N<br />

New installer in the work site has been trained in safety<br />

Y N<br />

Components installation<br />

The insulation is properly installed according with the system description<br />

Y N<br />

The spacers are properly installed and fixed<br />

Y N<br />

Vapour barrier is installed properly<br />

Y N<br />

Are there thermal bridges visibles<br />

Y N<br />

I.2. Cutting list templates<br />

ArcelorMittal Construction Page 17 of 21<br />