5. General rules<br />

5.1. Inspection of existing works<br />

Before starting the installation, it is necessary to check the works and analyze if<br />

there are deviations in the existing works (structure alignment, dimensions, etc.)<br />

that could concern your own works and stop you installing materials properly.<br />

5.2. Inspection of installation work<br />

Your own works must be inspected regularly to verify that all the works are<br />

being developed according with the manufacturer’s instructions and the<br />

construction rules.<br />

When works are done professionally, we all will get the customer satisfaction<br />

and reducing the claims.<br />

The checking list documents provided in this document can help to do it.<br />

5.3. Structure alignment<br />

If the structure is not properly aligned, the roof will not be with the right pitch.<br />

Every error in the structure will be transmitted to the roof.<br />

When defects in the alignment, etc. the contractor should correct the defects or<br />

installing a substructure prior starting our works.<br />

Maximum deflection of purlins must be considered to avoid water retentions on<br />

the roof.<br />

5.4. Installing the panels<br />

Panels have to be installed according with the layout drawing prepared for this<br />

job. It must be done in the direction indicated in the drawings.<br />

Before interrupting the day works, profiles must be secured to avoid uplift due to<br />

the wind action.<br />