The materials must be distributed on site as close as possible to the area where<br />
they will be installed.<br />
Bundles can not be stacked on top of each other on the construction site.<br />
They can be delivered stacked but they must be unloaded and stored<br />
separately.<br />
When lifting the bundles to the roof, you must secure them to avoid sliding<br />
sheets or panels.<br />
Before leaving bundles on the roof, you must check with the contractor that the<br />
structure can support the bundled weight.<br />
3.3. Un-packaging<br />
When you unpack the materials you have to take care about the risk of<br />
displacements of the materials or up-lifting them due to the wind action.<br />
Waste material has to be taken to the proper place to avoid dirty and risk of<br />
accidents.<br />
3.4. Protective film<br />
Coated products are supplied with a removable<br />
protective film to prevent mechanical damage<br />
during transport and assembly. This film must<br />
be removed 15 days after outside storage<br />
exposed to weather and/or immediately after<br />
installation, whichever is soonest.<br />
4. Safety<br />
The work site must have the collective protective measures installed properly<br />
before starting the works.<br />
These protections must be defined according with the requirements of the<br />
safety project created by the General contractor.<br />
Employees must be equipped with the individual protections appropriated for<br />
the job that they are doing.<br />
Some of the protections are: helmets, gloves, boots, harness, etc.<br />
ArcelorMittal Construction Page 5 of 21<br />