Year 2025 Transportation Master Plan Update - City of Oviedo
Year 2025 Transportation Master Plan Update - City of Oviedo
Year 2025 Transportation Master Plan Update - City of Oviedo
You also want an ePaper? Increase the reach of your titles
YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.
Table 7-7: Connections and Traffic Calming Projects<br />
7.6 Transit Services<br />
The <strong>City</strong> <strong>of</strong> <strong>Oviedo</strong> is currently served by one transit route (Link 47) that provides<br />
access between UCF, the <strong>Oviedo</strong> Marketplace, the 419/426 corridor, and Seminole<br />
Community College. For various reasons, this route consistently ranks among the<br />
lowest performing routes in the entire Lynx transit system. The performance <strong>of</strong> the<br />
current route should not discourage the <strong>City</strong> from embracing transit as a means for<br />
providing improved mobility for citizens within the <strong>City</strong>. One <strong>of</strong> the major underlying<br />
reasons for the poor transit performance is due to the long headways, or time periods<br />
between buses along the route, the orientation <strong>of</strong> the route, and the low-density<br />
development pattern along much <strong>of</strong> the route despite the fact that it serves major<br />
destination such as the Seminole Community College, UCF, and the <strong>Oviedo</strong><br />
Marketplace.<br />
The plan recommends restructuring existing transit service into two routes between<br />
UCF to the Community College to the <strong>Oviedo</strong> Marketplace along the Lockwood<br />
<strong>City</strong> <strong>of</strong> <strong>Oviedo</strong> 7-6<br />
<strong>Year</strong> <strong>2025</strong> <strong>Transportation</strong> <strong>Master</strong> <strong>Plan</strong> <strong>Update</strong>