addendum 2
addendum 2
addendum 2
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
Wal-Mart Stores, Inc. CR # 0<br />
Divisional Change Request Summary CO Version 0<br />
See bottom of form for detailed instructions.<br />
Store<br />
0-0<br />
City, ST<br />
,<br />
General Contractor<br />
0<br />
Trade<br />
Subcontractor<br />
Date<br />
Scope of Work Description:<br />
Walmart Cost Analysis (Walmart use only):<br />
Scope of Work<br />
Description<br />
Materials Units<br />
Labor Equipment<br />
Item Description UOM Qty Cost Per Unit Total per MH MHRS Rate Total Eq. Type # Hrs. Rate Total<br />
$ -<br />
$ -<br />
$ - $ -<br />
$ -<br />
$ -<br />
$ - $ -<br />
$ -<br />
$ -<br />
$ - $ -<br />
$ -<br />
$ -<br />
$ - $ -<br />
$ -<br />
$ -<br />
$ - $ -<br />
$ -<br />
$ -<br />
$ - $ -<br />
$ -<br />
$ -<br />
$ - $ -<br />
$ -<br />
$ -<br />
$ - $ -<br />
$ -<br />
$ -<br />
$ - $ -<br />
$ -<br />
$ -<br />
$ - $ -<br />
$ -<br />
$ -<br />
$ - $ -<br />
$ -<br />
$ -<br />
$ - $ -<br />
$ -<br />
$ -<br />
$ - $ -<br />
$ -<br />
$ -<br />
$ - $ -<br />
$ -<br />
$ -<br />
$ - $ -<br />
$ -<br />
$ -<br />
$ - $ -<br />
$ -<br />
$ -<br />
$ - $ -<br />
$ -<br />
$ -<br />
$ - $ -<br />
$ -<br />
$ -<br />
$ - $ -<br />
$ -<br />
$ -<br />
$ - $ -<br />
$ -<br />
$ -<br />
$ - $ -<br />
$ -<br />
$ -<br />
$ - $ -<br />
$ -<br />
$ -<br />
$ - $ -<br />
$ -<br />
$ -<br />
$ - $ -<br />
$ -<br />
$ -<br />
$ - $ -<br />
Subtotals $ -<br />
0.0 $ -<br />
0.0 $ - $ -<br />
$ -<br />
Sub-Contractors Profit $ Overhead 0.00% $ -<br />
Grand Total $ -<br />
$ -<br />
0.0 $ - $ -<br />
GC and Sub-Summary Instructions<br />
1. All Change Requests need to be completed per “Change Request Procedures to Prepare for Submittal" and "Change Request Instructions."<br />
2. All material costs for major items must have a quote or invoice attached.<br />
3. All labor rates must be accompanied by Labor Wage Breakdown sheet and / or union agreement as applicable.<br />
4. All Owned Equipment rates must be calculated by using the Equipment Worksheet or the Equipment Watch website.<br />
5. All Rented Equipment rates shall utilize the monthly rental rate supported by the specific and reasonable vendor quote / purchase order and attached to the change request.<br />
6. Calculation of the Unit per Manhour, manhours divided by quantities, example #8 wire, 1,000 LF, 8 manhours, 8/1000 = .008 MHRS/LF.<br />
7. Overhead and Profit of % includes all items identified in the General Conditions Article 3.1.2, "fee includes all overhead, profit, and operational items such as taxes, bonds, and insurance..."<br />
Total Cost