Unforeseen Conditions Changes to the Work<br />

Reference specification section for changes in the Work;<br />

All pricing submitted for changes to the Work will include supporting documentation to allow Walmart to analyze<br />

the costs for approval.<br />

Unforeseen changes shall be submitted based on the following criteria and the attached form.<br />

Change Daily Report<br />

The Contractor shall maintain a separate change daily report that includes but is not limited to the following<br />

data:<br />

1. Description of Work – Changed / unforeseen work performed for the specific day.<br />

2. Employees – Identify by name on the daily report.<br />

3. Classification – Identify each employees craft responsibility (laborer, operator, etc.).<br />

4. Time – Identify each employee hour worked, straight & overtime, all overtime work to be authorized by<br />

Walmart Construction Manager prior to execution of the work. Attach authorization to the daily time &<br />

material report.<br />

5. Hourly Rate – Rate to be based on actual Contractor booked costs (payroll) – Use Labor Rate Sheet as<br />

provided in the Walmart Change Request package.<br />

6. Equipment – Identify each piece of equipment used for this Work (to include model no., manufacturer,<br />

number of piece, size) – Use Blue Book Equipment Rate Form as provide in the Walmart Change Request<br />

package.<br />

7. Equipment Hours – Submit hours actually worked for each piece of equipment.<br />

8. Equipment Rates – Submit rate for each piece of equipment as previously agreed and attach the equipment<br />

rate sheet. If not previously agreed to submit the rental rate and Purchase Order for the specific date of<br />

the Work. If Owned equipment submits the rate based on the Contract requirements per the Blue Book and<br />

forms in the Walmart Change Request package.<br />

9. Materials – All materials expended for Unforeseen Condition Work shall be quantified and supported with a<br />

Purchase Order, Invoice, quote and receiving reports to the job site.<br />

10. Other field quantities to include excavation, backfill, reinforcement, forming, piping, etc. shall be identified<br />

on the change daily report.<br />

11. All materials drawn from Contractor’s stock, Contractor shall obtain prior approval from the Walmart<br />

Construction Manager for pricing. In no instance shall the price of Contractor’s material exceed the<br />

prevailing price that Walmart could obtain for comparable quantities and types of material from commercial<br />

suppliers.<br />

12. Approvals – The Contractor’s Superintendent overseeing the Work and the Project Manager shall sign off<br />

on all Daily Change Reports. The General Contractor's review will verify the craft by name, man-hours,<br />

equipment model and hours and material for each daily change report.<br />

13. Weekly Summary – A weekly summary of the change shall be submitted to Walmart Construction Manager.<br />

This report will include daily man-hours, daily labor costs, daily equipment hours, daily equipment costs,<br />

daily material costs and total daily and to date quantities and costs.<br />

14. Drawings / Sketches – At the completion of the work, drawings and sketches shall be submitted as part of<br />

the claim that details the location and quantity of work which was performed.<br />

Change Request Modified 2011.06.27 Page 1 of 1