Annual Report 2008 English [PDF, 2.69 MB] - Tessenderlo Group
Annual Report 2008 English [PDF, 2.69 MB] - Tessenderlo Group
Annual Report 2008 English [PDF, 2.69 MB] - Tessenderlo Group
You also want an ePaper? Increase the reach of your titles
YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.
annual report <strong>2008</strong><br />
The prices of caustic<br />
potash and caustic soda<br />
were higher than in 2007<br />
This had no effect on the margins for the<br />
derivatives bleach and ferric chloride.<br />
The prices for sodium sulphide lagged<br />
behind.<br />
From the third quarter onwards, the prices<br />
of caustic potash rose to unprecedented<br />
heights, the result of an acute and<br />
worldwide shortage of the raw material<br />
potassium chloride. This meant demand<br />
could not be fully met.<br />
The construction of<br />
our own electricity power<br />
plant in <strong>Tessenderlo</strong><br />
has started<br />
38<br />
The margins of caustic soda as well as<br />
caustic potash both rose in comparison<br />
with 2007.<br />
The T-Power project has started for the<br />
construction of a 420 MW natural gas-fired<br />
electricity installation at the <strong>Tessenderlo</strong>