Annual Report 2008 English [PDF, 2.69 MB] - Tessenderlo Group
Annual Report 2008 English [PDF, 2.69 MB] - Tessenderlo Group
Annual Report 2008 English [PDF, 2.69 MB] - Tessenderlo Group
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
annual report <strong>2008</strong><br />
Under the terms of the agreements,<br />
salt discharges will be reduced to<br />
one tenth of current levels by 2014 at<br />
the latest. For this purpose,<br />
10 million EUR are being invested<br />
in the modification of the production<br />
installations in the plant at Ham. In<br />
addition, 20 million EUR will be invested<br />
in cleaning up sludge basins, and the<br />
company will co-operate to clean up the<br />
historic pollution of the banks of the local<br />
streams Laak and Winterbeek.<br />
Focus on energy<br />
The necessary energy surveys were<br />
carried out in <strong>2008</strong> in the companies that<br />
signed the Flemish Covenant on Energy<br />
Benchmarking. These surveys serve as the<br />
basis for the energy plans for the period<br />
<strong>2008</strong>-2012.<br />
A better insight into the energy situation<br />
resulted in further energy savings in<br />
several places.<br />
76<br />
Thanks to the new production process used<br />
in Ham, considerably less sludge needs<br />
to be stored. This means that 30 hectares<br />
of land will become available for new<br />
industrial estates. In joint agreement with<br />
the Flemish and the Limburg authorities,<br />
<strong>Tessenderlo</strong> <strong>Group</strong> is keen to convert the<br />
vacant space in Ham into industrial land.<br />
Its location along the Albert canal is an<br />
important advantage.<br />
Quality department<br />
In <strong>2008</strong>, the quality department continued<br />
to assist the various departments in<br />
implementing and maintaining the quality<br />
management systems in accordance<br />
with the international standards, and<br />
maintaining the required certificates for<br />
the marketing of products in the various<br />
markets.<br />
With regard to the historic soil<br />
contamination of the factory sites in<br />
Limburg, the extent of the contamination<br />
has been outlined in descriptive soil<br />
surveys as agreed with the public<br />
authorities. These surveys specify the risks<br />
as well as the necessity to clean up the soil.<br />
At the same time, the soil decontamination<br />
activities that were already underway, are<br />
being continued.<br />
Health, safety and risk management<br />
The production units of <strong>Tessenderlo</strong> <strong>Group</strong><br />
made major investments in health and<br />
safety in <strong>2008</strong>. For example, a new digital<br />
work permit system was introduced at<br />
the sites in West-Limburg (Belgium).<br />
Preparations for maintenance works now<br />
occur in a uniform and structured manner.