cw-6-2i
cw-6-2i
cw-6-2i
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
Panorama<br />
Italy<br />
Milan Out Bypass to Ease Congestion<br />
One of the most important ongoing infrastructure projects in Italy today is the TEEM<br />
construction site, Milan Outer Bypass, whose layout passes east of the city and is destined<br />
to ease congestion on the current ring road.<br />
The construction site, where concrete casting is involved, is managed by Icea on behalf<br />
of the main contractor, Arco TEEM Consortium, which includes Impresa Pizzarotti.<br />
Icea has recently completed working on casting the base of a big rainwater storage<br />
tank. The casting involved 700 m³, a Cifa K41L XRZ truck mounted pump fed by a fleet<br />
of Cifa mixers that ensured a continuous flow of concrete from the company production<br />
plant to the casting site.<br />
The pump was chosen<br />
by Icea for its versatility and<br />
hourly productivity (140<br />
m³/hour), as well as the<br />
horizontal envelop (that<br />
reaches over 35 meters)<br />
of the five sections boom,<br />
which could rach across<br />
the wide foundation.<br />
Icea owner, Angelo Di Fede<br />
said:<br />
“We have been<br />
working with<br />
Cifa machines for<br />
many years and<br />
we have never<br />
had any problem<br />
with machines<br />
we have in the<br />
fleet; ordinary<br />
maintenance<br />
interventions and<br />
small problems<br />
on the jobsite<br />
have always<br />
been solved by<br />
an efficient and<br />
prompt assistance<br />
service by Effretti<br />
professionals.”<br />
Fast-Form a Patented formwork, shuttering & access hire system.<br />
The versatile, lightweight, adjustable formwork & shuttering<br />
system that offers a fast & efficient alternative to costly timber shutters<br />
& panel systems. Save time & money on your next project<br />
Uses include bases, pile caps, beams, slabs, walls, radius<br />
formwork, irregular shapes, sheet pile capping beams & much<br />
more.<br />
Faster, Safer, Stronger, Greener, Cheaper! Cuts down or eliminates<br />
timber wastage completely<br />
“We give<br />
much importance<br />
to maintenance,<br />
which we pass on<br />
to specialized assistance<br />
centres,<br />
since we believe<br />
that having always<br />
efficient machines<br />
is the key<br />
to guarantee a<br />
satisfying jobsite<br />
productivity.”<br />
• Cifa<br />
Concrete Pumps<br />
Contractors World International Vol 6 No 1<br />
Page 11