Peru<br />
ULMA Climbing systems: SBF and BMK<br />
Bracket in Cerro Verde iron ore mineral<br />
processing plant<br />
ULMA Working On Mining and<br />
Hydropower Expansion<br />
ULMA has many years of experience, a wide scope of expertise<br />
in this area and has carried out a considerable number<br />
of projects in Peru.<br />
The growing demand for energy that comes with the<br />
fast development in the country has led to a multiplication<br />
of the construction of energy infrastructure. This has<br />
brought an increasing demand for ULMA solutions, given<br />
the proven expertise in the country.<br />
Expanding Mining Operations<br />
With prior experience from 2007, ULMA gets involved for<br />
the second time in this project, this time, in the expansion<br />
of the Cerro Verde mine managed by GyM S.A.<br />
This expansion is going to triple the ore processing capacity<br />
of the mine that produces more than 20% of the<br />
copper of the country to 360,000 tonnes.<br />
ULMA has provided specific solutions for this project.<br />
The 2.5 m thick slab required extra horizontal reinforcement<br />
against heavy wind that significantly increased the<br />
weight of the structure. The bracing of the T-60 shoring<br />
towers helped increasing their load capacity by more than<br />
1 tonne to support the slab.<br />
Hydroelectric Power Plant, Cerro<br />
del Aguila<br />
One of the largest projects currently in progress and one<br />
that will become the second largest hydroelectric power<br />
plant in Peru is Cerro del Aguila with a production of 510<br />
MW.<br />
The project means a real challenge due to the technical<br />
complexity, but also because of the location and the difficult<br />
access to the area.<br />
A consortium of GyM and Astaldi appointed ULMA as<br />
formwork supplier for the construction of the dam, the<br />
powerhouse and the intake.<br />
The dam is 80 m high<br />
and 270 m wide at the<br />
crest.<br />
The expansion of the<br />
iron ore mine operated<br />
by Cerro Verde<br />
Mining Company,<br />
Arequipa, Peru, will<br />
triple the processing<br />
capability.<br />
Page 38 Contractors World International Vol 6 No 1