Turkey<br />
Skyland Office Tower,<br />
Istanbul<br />
At 284 m height each, the<br />
Skyland Office Tower and<br />
Residence Tower will be<br />
Turkey’s tallest buildings<br />
upon completion.<br />
Construction of the Skyland<br />
Office Tower in progress in<br />
the heart of Istanbul building<br />
will be Turkey’s tallest structure.<br />
Doka’s Platform SCP is a feature of the<br />
construction.<br />
This high-rise-core forming machine<br />
ensures rapid construction progress.<br />
Doka is also providing Xclimb 60<br />
protection screen for both the Skyland<br />
Office and Residence Towers.<br />
Developer, Eroğlu, selected the<br />
name “Skyland” for his three skyscrapers:<br />
at 284 m height each, the Skyland<br />
Office and Residence Towers and the<br />
Skyland Hotel. The main building contractor<br />
is Alcen.<br />
Challenging Formwork Demand<br />
The challenge presented by the office tower in terms of<br />
formwork technology is twofold:<br />
• The architects decided on a triangular ground plan and,<br />
therefore, the building core.<br />
• The risk of earthquakes in Istanbul presents special<br />
challenges related to static engineering.<br />
Thus, lower level walls are 1.5 m thick, at 100 m they<br />
measure 1.1 m, with the wall thickness reduced to 60 cm<br />
in the final storeys. Additional stability is created thanks to<br />
monolithic construction, where walls and floors are reinforced<br />
in one go.<br />
Given these demands, Doka’s self-climbing Platform<br />
SCP was proposed. Alcen Owner, Alparslan Sabanci, said:<br />
“We got introduced to this system during the<br />
Ağaoğlu Maslak 1453 project; now we are using it<br />
to erect the entire primary core of this skyscraper.<br />
Doka submitted a better engineering solution”,<br />
“The construction progress<br />
shows that we made the<br />
right decision when selecting<br />
the Platform SCP.”<br />
Optimised platform<br />
for high-rise cores.<br />
Any ground plan can be formed<br />
quickly and flexibly with the new<br />
version of this modular high-rise<br />
core forming system. A few highperforming<br />
hydraulic cylinders raise<br />
the wall formwork – in this case<br />
Doka’s large-area formwork Top 50<br />
Page 36 Contractors World International Vol 6 No 1