In the first construction stage of the intake, modular<br />
formwork was used to provide utmost versatility: ORMA<br />
for straight walls, CLR and FLECTOR circular formwork for<br />
2.6 m high tiers of curved walls.<br />
BRIO modular scaffolding was used to enable workers<br />
to carry out parallel works while the construction went on.<br />
In the second and third stage, the walls were built with<br />
SBF single-sided climbing bracket. Because the product was<br />
new to the Peruvian market, the workers were trained on<br />
how to use it in order to increase the assembly efficiency.<br />
Tata Steel<br />
Asymmetric<br />
Slimflor Beams<br />
Tata Steel relaunches its Asymmetric Slimflor Beams<br />
(ASBs) making them more accessible than ever before,<br />
with a shorter production time and improved<br />
availability. Responding to customer feedback, the<br />
ASBs are to be produced to order, enabling accurate<br />
programming for construction projects.<br />
Manufactured in the UK to the exacting standards<br />
required for CE-marked products, and recently certified<br />
to BES 6001, ASBs beams are now available on a<br />
project basis from rolling campaigns for smaller minimum<br />
order quantities per serial size (>120 tonnes).<br />
The shorter lead-time, typically 6-8 weeks, along with<br />
rollings for smaller quantities provides customers<br />
with greater flexibility.<br />
Work is advancing on the construction of the<br />
2nd largest hydropower scheme in Peru, at<br />
Cerro del Aguila<br />
In this type of project, machinery is constantly moved<br />
from one place to another, which had to be taken into<br />
account when building the slab. The solution to this was<br />
achieved by using MK Shoring and Gantry Bracket MT<br />
as support for the MK Truss, BRIO and ENKOFLEX beam<br />
formwork.<br />
• ULMA<br />
An integral part of the Advance sections range,<br />
ASBs have been specifically designed for use with<br />
ComFlor 225 deep decking to create the Slimdek system,<br />
an engineered solution that offers a service-integrated,<br />
minimal depth, cost-effective shallow floor<br />
construction ideal for car parks, residential developments,<br />
hospitals and commercial buildings where<br />
minimising floor depth, and achieving onerous acoustic<br />
and vibration criteria are key consideration.<br />
Mike Hoare, Product Marketer, Construction<br />
Structures said:<br />
“ASBs are an essential part of a cost-effective<br />
shallow floor solution. The composite action,<br />
which is assisted by the embossed surface<br />
on the upper flange of the ASB, significantly<br />
increases the structural strength of the floor.”<br />
“We are keen to demonstrate the flexibility<br />
that ASBs can offer to construction programmes.<br />
In addition to our extensive products<br />
and service offering, we have a team of<br />
structural engineers on-hand to offer our customers<br />
free design assistance for optimal use<br />
of ASBs in any building project.<br />