15.05.2015 Views

D5 Annex report WP 7: ETISDatabase methodology ... - ETIS plus

D5 Annex report WP 7: ETISDatabase methodology ... - ETIS plus

D5 Annex report WP 7: ETISDatabase methodology ... - ETIS plus

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

<strong>D5</strong> <strong>Annex</strong> <strong>WP</strong> 7: <strong>ETIS</strong> DATABASE METHODOLOGY AND DATABASE USER<br />

MANUAL – PASSENGER TRANSPORT SUPPLY<br />

Table 3.2 Variables in the scope of <strong>WP</strong> 7<br />

Ref.<br />

supporting<br />

indicator<br />

Variable<br />

Title of the variable<br />

2.1.4<br />

tg<br />

d k length of network link k on corridor l and meeting EC directive<br />

on standard track<br />

2.1.4<br />

ps<br />

d k length of network link k on corridor l and meeting EC directive<br />

on standard power supply<br />

2.1.4<br />

sg<br />

d k length of network link k on corridor l and meeting EC directive<br />

on train signaling system<br />

1.6.2 fc m average fuel consumption of a passenger car in country m<br />

1.6.2 fp m average fuel price in country m<br />

1.6.2 rch ij road charges applied on fastest route between i and j<br />

1.6.2 ocr m average passenger car occupancy rate in country m<br />

2.6.1 T ij rail travel time on the relation (i,j) on the fastest connection<br />

between those stations representing the centers between I and j<br />

2.6.4<br />

bu sin ess<br />

f<br />

cost function for rail tariff for country m and demand segment<br />

m<br />

business<br />

2.6.4<br />

non _ bu sin ess<br />

f<br />

cost function for rail tariff for country m and demand segment<br />

m<br />

non­business<br />

2.6.4 serv ij rail service segment offered between i and j on the fastest route<br />

3.6.1<br />

3.6.2<br />

2.6.2<br />

Q rpij<br />

probability of using route r between i and j when travelling in trip<br />

purpose p<br />

3.6.1 A pik access time from i to k when travelling in trip purpose p<br />

3.6.1 OO pk out­of­vehicle­time spent in k before starting from k when<br />

travelling in trip purpose p<br />

3.6.1 F kl flight time from k to l.<br />

3.6.1 DO pl out­of­vehicle­time spent in l after landing in l when travelling in<br />

trip purpose p<br />

3.6.1 E plj egress time from i to k when travelling in trip purpose p<br />

3.6.1<br />

3.6.2<br />

3.6.1<br />

3.6.2<br />

3.6.1<br />

3.6.2<br />

3.6.1<br />

3.6.2<br />

k<br />

l<br />

m<br />

r<br />

departing airport of a certain O/D relation<br />

arriving airport of a certain O/D relation<br />

intermediate airport(s) of a certain O/D relation<br />

flight routing, consisting of k, none to two m and l<br />

3.6.2 C pik access/egress costs from i to k when travelling in trip purpose p<br />

3.6.2 FC kl flight costs from k to l.<br />

2.6.2 FF r number of connections available on a flight routing, following the<br />

rule: there is no service (non­stop, direct or with plane change)<br />

leaving the airport k earlier or at the same time and the arrival<br />

time at the destination airport l is not earlier or at the same time<br />

5.6.2<br />

pc<br />

C k direct ferry costs for carriage of a passenger car on link k<br />

5.6.2 C k<br />

pass<br />

direct ferry costs for carriage of a passenger on link k<br />

12<br />

R20040089.doc<br />

27 May 2004

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!