15.05.2015 Views

D5 Annex report WP 7: ETISDatabase methodology ... - ETIS plus

D5 Annex report WP 7: ETISDatabase methodology ... - ETIS plus

D5 Annex report WP 7: ETISDatabase methodology ... - ETIS plus

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

<strong>D5</strong> <strong>Annex</strong> <strong>WP</strong> 7: <strong>ETIS</strong> DATABASE METHODOLOGY AND DATABASE USER<br />

MANUAL – PASSENGER TRANSPORT SUPPLY<br />

Method variable V14 r flight routing, consisting of k, none to<br />

two m and l<br />

EUROCONTROL, OAG<br />

network model air<br />

Remarks concerning method<br />

variable computation<br />

Flight time (F kl ) is preferably to be calculated in a network model air using EUROCONTROL flight data, as flight<br />

times from software, which is distributed commercially (like OAG, Hafas), does not take in account any charter<br />

services (e. g. to holiday destinations, but just information of scheduled services.<br />

The route choice model handling air transport should not just focus on shortest path, as – increasing with the travel<br />

distance – the number of possible routings a traveller can choose rises significantly and other attributes of air travel like<br />

frequency and price severely influence the consumers choice. E . g. A business traveller would hardly opt for a nonstop<br />

tourist flight offering the shortest travel time , due to starting from an airport very close to the travel of the<br />

travellers origin of travel, if such a flight is offered just once a week. On the other hand a non­business traveller might<br />

prefer such a flight, instead of using a transfer connection, which is offered three times per day but a significant higher<br />

tariff.<br />

64<br />

R20040089.doc<br />

27 May 2004

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!