D5 Annex report WP 7: ETISDatabase methodology ... - ETIS plus
D5 Annex report WP 7: ETISDatabase methodology ... - ETIS plus
D5 Annex report WP 7: ETISDatabase methodology ... - ETIS plus
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
<strong>D5</strong> <strong>Annex</strong> <strong>WP</strong> 7: <strong>ETIS</strong> DATABASE METHODOLOGY AND DATABASE USER<br />
MANUAL – PASSENGER TRANSPORT SUPPLY<br />
Variable definition<br />
Variable computation method<br />
Directly from a database or<br />
agreed<br />
classifications/nomenclatures<br />
Output of the model<br />
Method variable V1 l corridor <br />
Method variable V2<br />
share of infrastructure section on<br />
corridor l meeting EC directive on<br />
standard track<br />
X l<br />
tg<br />
calculation<br />
based on data from the UIC rail<br />
network<br />
Method variable V3<br />
ps<br />
X l share of infrastructure section on<br />
corridor l meeting EC directive on power<br />
calculation<br />
based on data from the UIC rail<br />
network<br />
supply<br />
Method variable V4<br />
share of infrastructure section on<br />
corridor l meeting EC directive on<br />
signaling system<br />
X l<br />
sg<br />
calculation<br />
based on data from the UIC rail<br />
network<br />
Method variable V5 d i length of rail network link i belonging<br />
to corridor l<br />
<strong>WP</strong> 5<br />
Method variable V6<br />
[km]<br />
tg<br />
d k length of network link k on corridor l<br />
and meeting EC directive on standard track<br />
[km]<br />
UIC rail network<br />
52<br />
R20040089.doc<br />
27 May 2004