2. Qualification Information<br />

Notes on Form of Qualification Information<br />

The information is to be filled in by individual bidders and by each member of Joint Venture in case<br />

of JV participating in the Bid. The following pages will be used for purposes of post-qualification as<br />

provided for in Clause 4 of the Instructions to Bidders. This information will not be incorporated in<br />

the Contract. Attach additional pages as necessary.<br />

Individual Bidders Qualification<br />

1 (i) Constitution or legal status of Bidder<br />

(ii) Place of registration:<br />

(iii) Principal place of business:<br />

(iv) Power of attorney of signatory of Bid<br />

Total annual volume of civil engineering construction<br />

work executed and payments received in the last five years<br />

preceding the year in which bids are invited. (Attach<br />

certificate from Chartered Accountant)<br />

[attach copy]<br />

…………….<br />

…………….<br />

[attach]<br />

Year (Rs. In millions)<br />

2007 -2008<br />

2008 -2009<br />

2009 -2010<br />

2010 -2011<br />

2011-2012<br />

(A) Work performed as prime Contractor (in the same name and style) on construction works of a<br />

similar nature and volume over the last five years 10 . [Attach certificate from the Engineer-in-charge.]<br />

<strong>Project</strong><br />

Name<br />

Name<br />

Employer<br />

of<br />

Descriptio<br />

n of work<br />

Contra<br />

ct No.<br />

Value<br />

of<br />

contra<br />

ct<br />

Date<br />

of<br />

Issue<br />

of<br />

Work<br />

Order<br />

Stipulated<br />

Date of<br />

Completio<br />

n<br />

Actual<br />

Date of<br />

Completio<br />

n<br />

Remarks<br />

explainin<br />

g reasons<br />

for Delay,<br />

if any<br />

(B) Quantities of work executed as prime contractor (in the same name and style)in the last five years: 11<br />

Year<br />

2007-2008<br />

2008-2009<br />

2009-2010<br />

2010-2011<br />

2011-2012<br />

Name<br />

of the<br />

Work<br />

Name of<br />

Employer*<br />

Quantity of work performed<br />

Supply, Supply, Delivery and<br />

Delivery and laying of HDPE<br />

laying of DI Pipelines of OD 110<br />

Pipelines of Dia mm dia and above.<br />

350 mm and<br />

above.<br />

Elevated<br />

Service<br />

Reservoirs<br />

400 KL<br />

and above<br />

capacity<br />

[@ The items or work for which date is requested should tally with that specified in ITB 5.5A(c)<br />

* Attach certificates from Engineer in-charge]