- Page 1 and 2: VIZIANAGARAM MUNICIPALTY Andhra Pra
- Page 3 and 4: 3 INVITATION FOR BID (IFB)
- Page 5 and 6: 5 (ii) The number mentioned on ackn
- Page 7 and 8: 7 31. Preference for Domestic Bidde
- Page 9 and 10: 9 (a) defines, for the purposes of
- Page 11 and 12: 11 Employer, as the Employer shall
- Page 13 and 14: 13 critical equipment stated in the
- Page 15 and 16: 15 • consistent history of litiga
- Page 17 and 18: 17 11. Amendment of Bidding Documen
- Page 19 and 20: 19 15. Currencies of Bid and Paymen
- Page 21 and 22: 21 Tendering System bids are given
- Page 23 and 24: 23 26. Clarification of Bids 27. Ex
- Page 25 and 26: 25 Bids 34. Notification of Award a
- Page 27 and 28: 27 Section II. Bidding Data Sheet A
- Page 29 and 30: 29 ITB 5.5 B (a) The essential equi
- Page 31 and 32: 31 ITB 10.2 Pre-bid Meeting shall b
- Page 33 and 34: 33 ITB 36.1 ITB 37.1 The Advance Pa
- Page 35 and 36: Section IV. Forms of Bid, Qualifica
- Page 37 and 38: 37 We hereby confirm that this Bid
- Page 39 and 40: 39 (c) Value of Electrical & Sanita
- Page 41: 2.2 Availability of Major items of
- Page 45 and 46: 45 2.13 SAMPLE FORMAT FOR EVIDENCE
- Page 47 and 48: 47 indicated in the contract, or fo
- Page 49 and 50: 49 5. We agree that the certificate
- Page 51 and 52: 51 revised Program including enviro
- Page 53 and 54: 53 4. Agreement [The Agreement shal
- Page 55 and 56: 55 Table of Clauses A. General ....
- Page 57 and 58: 57 General Conditions of Contract A
- Page 59 and 60: 59 (dd) The Works are what the Cont
- Page 61 and 62: 61 9.2. The Project Manager may req
- Page 63 and 64: 63 the types and proportions of cur
- Page 65 and 66: 65 2003 issued under this Act, prov
- Page 67 and 68: 67 either party may refer a decisio
- Page 69 and 70: 69 Contractor as soon as reasonably
- Page 71 and 72: 71 Quantities, the quotation by the
- Page 73 and 74: 73 (l) Other compensation events, l
- Page 75 and 76: 75 (f) If the Contractor fails to c
- Page 77 and 78: 77 E. Finishing the Contract 55. Co
- Page 79 and 80: 79 (ii) “fraudulent practice” 1
- Page 81 and 82: 81 Special Conditions of Contract S
- Page 83 and 84: 83 GCC 8.1 GCC 9.1 Schedule of othe
- Page 85 and 86: 85 (India), both in cases of Foreig
- Page 87 and 88: 87 by the contractor.) Contract pri
- Page 89 and 90: 89 ………….[insert date] * The
- Page 91 and 92: Appendices 91
- Page 93 and 94:
93 not making discrimination agains
- Page 95 and 96:
95 other legitimate uses, or to the
- Page 97 and 98:
97 Appendix 2 Tables of Adjustment
- Page 99 and 100:
99 8. Others i for HDPE Resin Ro-Wh
- Page 101 and 102:
101 no.24,25 and 26 of the Conditio
- Page 103 and 104:
103 Sample Format of Adjudicator’
- Page 105 and 106:
105 Scope of Work: Providing compre
- Page 107 and 108:
107 Testing of Pipes and Equipment:
- Page 109 and 110:
109 S. No. Section Specification 1
- Page 111 and 112:
111 SECTION- VII A GENERAL SPECIFIC
- Page 113 and 114:
113 locations, nose musk at dust pr
- Page 115 and 116:
115 1.13 Specifications Referred to
- Page 117 and 118:
117 Charge. All foundation trenches
- Page 119 and 120:
119 3.3.1 Coarse Aggregates Coarse
- Page 121 and 122:
121 3.6 Concrete Proportioning 3.6.
- Page 123 and 124:
123 approval by the Engineer-in-Cha
- Page 125 and 126:
125 3.9 Form Work 3.9.1 The Form Wo
- Page 127 and 128:
127 3.13 Expansion Joints Expansion
- Page 129 and 130:
129 Type of Work Cement : Sand a) O
- Page 131 and 132:
131 5.2 White Washing 5.2.1 White w
- Page 133 and 134:
133 The manhole cover with frame sh
- Page 135 and 136:
135 DIVISION - 1 GENERAL SPECIFICAT
- Page 137 and 138:
137 DIVISION-2 SITE WORK 2.1 Intima
- Page 139 and 140:
139 DIVISION-3 EARTH WORK 3. Earth
- Page 141 and 142:
141 earth. The additional excavatio
- Page 143 and 144:
143 The unit price bid there for in
- Page 145 and 146:
145 A sand whose grading falls out-
- Page 147 and 148:
147 Mortar Test cubes shall be cast
- Page 149 and 150:
149 (b) Cost: The cost of sand for
- Page 151 and 152:
151 After the plaster has sufficien
- Page 153 and 154:
153 (b) Nominal maximum size of Agg
- Page 155 and 156:
155 6.2.3 Cement: General Shall con
- Page 157 and 158:
157 accordance with I.S. 2386 (Part
- Page 159 and 160:
159 proposed form work and supports
- Page 161 and 162:
161 Prevention of Repeated failure
- Page 163 and 164:
163 6.2.11 Preparation for Placing
- Page 165 and 166:
165 The placing of concrete shall b
- Page 167 and 168:
167 Interior surface shall be slope
- Page 169 and 170:
169 c) Cost: The cost of furnishing
- Page 171 and 172:
171 DIVISION-7 MATERIALS REQUIRED F
- Page 173 and 174:
173 taken into account by the Contr
- Page 175 and 176:
175 DIVISION-8 LAYING AND JOINTING
- Page 177 and 178:
177 testing apparatus shall be subj
- Page 179 and 180:
179 9.4 Manufacturing 8.4.1 General
- Page 181 and 182:
181 9.6 Coating Coating shall not b
- Page 183 and 184:
183 from the pipe by tapping at poi
- Page 185 and 186:
185 9.16 Air Valves: Air valves sha
- Page 187 and 188:
187 DIVISION - 10 HOUSE SERVICE CON
- Page 189 and 190:
189 moulding process and coils inse
- Page 191 and 192:
191 2. Dimensions The Dimension of
- Page 193 and 194:
193 The Ball Valves intended for co
- Page 195 and 196:
195 2 Density 3 Oxidation and Induc
- Page 197 and 198:
197 Nom inal dia vii.Thickness shal
- Page 199 and 200:
199 ii) Hydraulic Characteristics:-
- Page 201 and 202:
201 11.2 Transporting and handling
- Page 203 and 204:
203 11.6 CONCRETE ENCASEMENT AND TH
- Page 205 and 206:
205 too high and possibly cause the
- Page 207 and 208:
207 A normal pressure test on a wel
- Page 209 and 210:
209 pump houses will be of small to
- Page 211 and 212:
211 retention of a good ball is not
- Page 213 and 214:
213 6.2.5 Staking Newly planted tre
- Page 215 and 216:
215 SECTION -VII B CONSTRUCTION OF
- Page 217:
217 1.11. FINISHING: A smooth dense
- Page 220 and 221:
220 S. Potential Negative No. Impac
- Page 222 and 223:
222 S. No. Activity 3 Haulage / tra
- Page 224 and 225:
224 S. No. Activity 7. Pollution fr
- Page 226 and 227:
226 S. No. Activity 11 Disposal of
- Page 228 and 229:
228 S. No. Activity BoQ Reference A
- Page 230 and 231:
230 S. No. Activity 16 Work Camps B
- Page 232 and 233:
232 S. No. Activity 18 Clearing of
- Page 234 and 235:
234
- Page 236 and 237:
236 SUPPLIMENTARY INFORMATION HISTO
- Page 238 and 239:
238 Head Works is conveyed to 1500
- Page 240 and 241:
240 SECTION VIII DRAWINGS
- Page 242 and 243:
242 S.No Drawing Title Drawing No.
- Page 244 and 245:
Invitation for Bids 244 Section X.
- Page 246 and 247:
Invitation for Bids 246 Form of Bid
- Page 248 and 249:
Invitation for Bids 248 PERFORMANCE