Conformity assessment of UFCS against PEFC (2010).pdf - ITS Global
Conformity assessment of UFCS against PEFC (2010).pdf - ITS Global
Conformity assessment of UFCS against PEFC (2010).pdf - ITS Global
You also want an ePaper? Increase the reach of your titles
YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.
Evaluation and <strong>assessment</strong> <strong>of</strong> Uruguayan Forest Certification scheme <strong>against</strong> the requirements <strong>of</strong> the <strong>PEFC</strong> Council<br />
… as reference document to<br />
develop sustainable …<br />
9 2.1 Evolution <strong>of</strong> Sustainable<br />
Forest Management<br />
Standard, 1 st Phase, 4 th<br />
Para<br />
… (Spanish forest<br />
management standard).<br />
9 2.1 Evolution <strong>of</strong> Sustainable<br />
Forest Management<br />
Standard, 1 st Phase, 5 th<br />
Para, 1 st and 2 nd dot points<br />
The document …<br />
Clarification<br />
… (Spanish forest management standard which is endorsed<br />
under the Spanish scheme).<br />
This document …<br />
It is STC-SFM not SFC-SFM!<br />
UNIT 1152 is before UNIT 1151 – it is normal to have<br />
documents listed in numerical order even though 1152 is the<br />
actual SFM standard<br />
p.10 are all the necessary documents for evaluation in English?<br />
Yes or no. )last but one sentence; see also page 17, 15 Doc.)<br />
p.10 the non-conformity with public consultation (53 instead <strong>of</strong><br />
60 days minimum) may be tolerated under the existing<br />
circumstances, but the total absence <strong>of</strong> responses is not<br />
encouraging. Less important is the issue <strong>of</strong> the accreditation<br />
symbol (p.42, 8.5, 22) because it is not a mandatory<br />
requirement.<br />
10 2.1 Evolution <strong>of</strong> Sustainable There is more than 1 requirement in Annex 4!<br />
Forest Management<br />
Standard, 1 st Phase, 5 th … the use <strong>of</strong> the requirements specified …<br />
Para, 3 rd dot point<br />
… the use <strong>of</strong> requirement<br />
Comments noted. Report has been amended<br />
accordingly.<br />
Comments valid. Report has been amended<br />
accordingly.<br />
1. All necessary documents are not in English.<br />
2. As noted in the body <strong>of</strong> the report, five<br />
organisations commented during public<br />
consultation phase (April-May 2009).<br />
Comments noted. Additional text added for<br />
further clarification.<br />
Comments valid. Report has been amended<br />
accordingly.<br />
Clarification Comments valid. Report has been amended<br />
specified …<br />
10 2.1 Evolution <strong>of</strong> Sustainable<br />
Standard, 2 nd Phase, 1 st<br />
Forest Management<br />
accordingly.<br />
www.itsglobal.net Page 73