13.06.2015 Views

Conformity assessment of UFCS against PEFC (2010).pdf - ITS Global

Conformity assessment of UFCS against PEFC (2010).pdf - ITS Global

Conformity assessment of UFCS against PEFC (2010).pdf - ITS Global

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Evaluation and <strong>assessment</strong> <strong>of</strong> Uruguayan Forest Certification scheme <strong>against</strong> the requirements <strong>of</strong> the <strong>PEFC</strong> Council<br />

… as reference document to<br />

develop sustainable …<br />

9 2.1 Evolution <strong>of</strong> Sustainable<br />

Forest Management<br />

Standard, 1 st Phase, 4 th<br />

Para<br />

… (Spanish forest<br />

management standard).<br />

9 2.1 Evolution <strong>of</strong> Sustainable<br />

Forest Management<br />

Standard, 1 st Phase, 5 th<br />

Para, 1 st and 2 nd dot points<br />

The document …<br />

Clarification<br />

… (Spanish forest management standard which is endorsed<br />

under the Spanish scheme).<br />

This document …<br />

It is STC-SFM not SFC-SFM!<br />

UNIT 1152 is before UNIT 1151 – it is normal to have<br />

documents listed in numerical order even though 1152 is the<br />

actual SFM standard<br />

p.10 are all the necessary documents for evaluation in English?<br />

Yes or no. )last but one sentence; see also page 17, 15 Doc.)<br />

p.10 the non-conformity with public consultation (53 instead <strong>of</strong><br />

60 days minimum) may be tolerated under the existing<br />

circumstances, but the total absence <strong>of</strong> responses is not<br />

encouraging. Less important is the issue <strong>of</strong> the accreditation<br />

symbol (p.42, 8.5, 22) because it is not a mandatory<br />

requirement.<br />

10 2.1 Evolution <strong>of</strong> Sustainable There is more than 1 requirement in Annex 4!<br />

Forest Management<br />

Standard, 1 st Phase, 5 th … the use <strong>of</strong> the requirements specified …<br />

Para, 3 rd dot point<br />

… the use <strong>of</strong> requirement<br />

Comments noted. Report has been amended<br />

accordingly.<br />

Comments valid. Report has been amended<br />

accordingly.<br />

1. All necessary documents are not in English.<br />

2. As noted in the body <strong>of</strong> the report, five<br />

organisations commented during public<br />

consultation phase (April-May 2009).<br />

Comments noted. Additional text added for<br />

further clarification.<br />

Comments valid. Report has been amended<br />

accordingly.<br />

Clarification Comments valid. Report has been amended<br />

specified …<br />

10 2.1 Evolution <strong>of</strong> Sustainable<br />

Standard, 2 nd Phase, 1 st<br />

Forest Management<br />

accordingly.<br />

www.itsglobal.net Page 73

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!