13.06.2015 Views

Conformity assessment of UFCS against PEFC (2010).pdf - ITS Global

Conformity assessment of UFCS against PEFC (2010).pdf - ITS Global

Conformity assessment of UFCS against PEFC (2010).pdf - ITS Global

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Evaluation and <strong>assessment</strong> <strong>of</strong> Uruguayan Forest Certification scheme <strong>against</strong> the requirements <strong>of</strong> the <strong>PEFC</strong> Council<br />

25 4.2.3 Group Certification This introduction relates in fact to the SFM system which<br />

relates to 5.3 <strong>of</strong> GD2<br />

25 35)<br />

The criteria and requirements for group certification as set<br />

The criteria and<br />

out in SD07 comply with <strong>PEFC</strong>C requirements.<br />

requirements for group There is no need to repeat the <strong>PEFC</strong>C reference!<br />

certification within <strong>UFCS</strong><br />

(SD07) comply with <strong>PEFC</strong>C<br />

requirements detailed in<br />

Annex 3, 4.1b.<br />

26 43) Comment – Under 7, it is explicit for the member but it is<br />

implicit for the Group Administrator!<br />

... forest area under his/her management should be added<br />

by <strong>PEFC</strong>C<br />

Comments noted. Text amended accordingly.<br />

Comments valid. Text amended accordingly<br />

Comments noted.<br />

p. 27,<br />

4.2.4, 46<br />

The consultants agree with the comment. The<br />

consultants used the exact wording <strong>of</strong> the<br />

<strong>PEFC</strong> Council Minimum Requirements<br />

Checklist (GL 2/<strong>2010</strong>), but would recommend<br />

that <strong>PEFC</strong>C considers amending the<br />

documentation so that it does not contain<br />

gender specific references.<br />

27 45) The shading is missing for the Conforms Comments valid. Report has been amended<br />

27 48)<br />

… on ad hoc basis … … on an ad hoc basis …<br />

28 49)<br />

… on ad hoc basis … … on an ad hoc basis …<br />

28 4.4 Overall Assessment Comment: I have a real concern on the <strong>assessment</strong> for 7),<br />

10), 14), 17) and 43) – I would seek further evidence to<br />

justify the current <strong>assessment</strong>.<br />

5. Assessment <strong>of</strong> <strong>UFCS</strong> Forest Management Standards <strong>against</strong> PEOLG<br />

accordingly.<br />

Comments valid. Report has been amended<br />

accordingly.<br />

Comments valid. Report has been amended<br />

accordingly.<br />

Comments noted. Assessment modified to<br />

recognise non-conformity associated with a<br />

lack <strong>of</strong> documentation requirements for<br />

making summary <strong>of</strong> FMP publicly available.<br />

29 5.1 Assessment Framework,<br />

1st Para<br />

<strong>UFCS</strong> utilizes Norm<br />

(Standard) 1152: 2009 …<br />

The <strong>UFCS</strong> utilizes Norm (Standard) UNIT 1152: 2009 …<br />

The conformity <strong>of</strong> the Criteria and Indicators <strong>of</strong> Standard …<br />

It is the C&I which provide the equivalence with the<br />

Comments were noted. Report has been<br />

amended accordingly.<br />

Text amended.<br />

www.itsglobal.net Page 81

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!