ARAVIND 09901366442 – 09902787224
WE PROVIDE CASE STUDY ANSWERS ASSIGNMENT SOLUTIONS PROJECT REPORTS AND THESIS www.mbacasestudyanswers.com aravind.banakar@gmail.com ARAVIND 09901366442 – 09902787224
WE PROVIDE CASE STUDY ANSWERS ASSIGNMENT SOLUTIONS PROJECT REPORTS AND THESIS
www.mbacasestudyanswers.com
aravind.banakar@gmail.com
ARAVIND 09901366442 – 09902787224
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
www.mbacasestudyanswers.com<br />
www.casestudysolution.in<br />
aravind.banakar@gmail.com<br />
<strong>ARAVIND</strong><br />
<strong>09901366442</strong> <strong>–</strong> <strong>09902787224</strong><br />
Project Management<br />
1. What happened to this project? Prepare a list of the factors that contributed to Revcon’s failure<br />
to obtain the product the wanted. For each factor, discuss what might have been done<br />
differently<br />
2. What went wrong with the project?<br />
3. Where were mistakes made in the project initially?<br />
4. How were problems allowed to persist and go uncorrected for so long?<br />
1. What is your opinion of Sean’s approach to creating a WBS and estimating project costs?<br />
2. What do you think about Deva’s approach to scheduling the move and estimating the costs?<br />
3. If you were Deva’s manager, would you consider her plan comprehensive?<br />
4. How would you prepare a plan for the move and what would your plan include?<br />
5. Working at a normal rate, in how many days can the job be completed? What should the bid be<br />
on this basis if Petersen attempted to obtain a profit of 10 percent before federal income taxes?<br />
6. What is the shortest possible time in which the bid can be completed? What should the bid be<br />
on this basis if Petersen attempted to obtain a profit of 10 percent before federal income taxes?<br />
7. If the job is obtained and the work is to be completed working at a normal rate, what portions<br />
of the work should be supervised most carefully to ensure that the job is completed on time?<br />
What portions of the work should be supervised most carefully if the contract is let on the basis<br />
of completing the job in the shortest possible time?<br />
8. If television station management felt that the estimated time for completing the job in the<br />
estimated time for completing the job in the shortest possible period of time was still too long,<br />
what could be done?