30.06.2015 Views

Installation Guide ECS5510-48S 48-Port 10G Ethernet ... - Edge-Core

Installation Guide ECS5510-48S 48-Port 10G Ethernet ... - Edge-Core

Installation Guide ECS5510-48S 48-Port 10G Ethernet ... - Edge-Core

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

CHAPTER 2 | Installing the Switch<br />

Mounting<br />

MOUNTING<br />

This switch can be mounted in a standard 19-inch equipment rack or on a<br />

horizontal surface. Mounting instructions for each type of site follow.<br />

RACK MOUNTING<br />

Before rack mounting the switch, pay particular attention to the following<br />

factors:<br />

◆<br />

◆<br />

◆<br />

◆<br />

Temperature: Since the temperature within a rack assembly may be higher<br />

than the ambient room temperature, check that the rack-environment<br />

temperature is within the specified operating temperature range.<br />

Mechanical Loading: Do not place any equipment on top of a rack-mounted<br />

unit.<br />

Circuit Overloading: Be sure that the supply circuit to the rack assembly is<br />

not overloaded.<br />

Grounding: Rack-mounted equipment should be properly grounded.<br />

Particular attention should be given to supply connections other than direct<br />

connections to the mains.<br />

To rack-mount devices:<br />

1. Attach the two brackets to the device using the eight M4 screws provided in<br />

the rack-mounting kit.<br />

NOTE: The switch can also be mounted in a rack using a rack shelf or<br />

rack “L” brackets.<br />

– 37 –

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!